Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5275Berry's Chapel Utility STP180 Cottonwood DriveFranklinWilliamsonNashville

Permit Information

TN0029718
Individual
Reissuance
Berry's Chapel Utility, Inc.
Berry's Chapel Utility STP
Treatment of domestic sewage
I
M
MW
29-JAN-2021
14-MAR-2006
01-FEB-2021
09-FEB-2021
16-MAR-2021
01-APR-2021
31-MAR-2026
Harpeth River at mile 77.9
treated domestic wastewater from Outfall 001
activated sludge
4952
.4
08-JUL-2024 03:49PM

Other DWR permits at this site

Permit Documents

View
Report11/18/17 Bypass Report18-NOV-2017
Letter17-0421 Letter11-JUL-2017
Letter17-0421 Ref10-JUL-2017
Letter18-0749 Letter10-SEP-2018
Letter18-0749 Ref07-SEP-2018
Form20.0209 CN-1457 Completed Form26-MAR-2020
Letter20.0209 HWC Influent Pump Station TDEC Submittal Letter signed 3-25-20.docx26-MAR-2020
Letter20.0209 approval letter 2020041515-APR-2020
Form2015 WW Operator Form15-SEP-2015
Form2016 CEI ICIS form24-JUN-2016
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

WWTP OverloadEFO CommunicationPer email from Jordan Fey--As we discussed on the phone, at this time there appears to be insufficient documentation to hold the Harpeth Wastewater Cooperative’s Berry’s Chapel STP under a moratorium. While the facility continues to violate effluent limitations, file review conducted by myself and previously by Wade Murphy did not reveal any orders or permit stipulations at this time requiring a moratorium. There was a letter requiring the facility to achieve 90 days of under 3 mg/L discharge for Total Nitrogen, which they have since achieved. The permit does require a 125,000 GPD reserve capacity for several subdivisions with failing septic systems that have since been attached to different sewer systems, and allows the Division to reallocate this flow if deemed appropriate. RGO 4/5/2019 4/5/2019Watch List

Inspections

20-JUL-2021Compliance Eval (non-sampling) (CEI)Out of Compliance
25-MAY-2016Compliance Eval (non-sampling) (CEI)Out of Compliance
12-DEC-2012Compliance Sampling (CSI)NOV
21-SEP-2011Performance Audit (PAI)NOV
11-SEP-2007Performance Audit (PAI)NOV
31-MAR-2005Compliance Sampling (CSI)NOV
21-AUG-2003Performance Audit (PAI)NOV

Wastewater Engineering Plans Review

20.0209ApprovedCDAWJ4/15/20204/15/2020Berrys Chapel WWTP Influent Pump Station Improvements
18.0749Approved-MNU8/22/20189/10/2018Berry's Chapel Utility, Inc. D.B.A. Harpeth WW Cooperative/Tech. Specs.
17.0421ApprovedLINEMNU6/20/20177/11/2017Foxen Canyon S/D
16.0053ApprovedLINEA. Bahour1/21/20162/1/20161439 Mentelle Drive
15.0709Approved-MNU11/2/201511/20/2015Berry's Chapel Utility, Inc. D.B.A. Hapreth Wastewater Cooperative
14.0834ApprovedLINEA. Bahour11/13/201412/12/2014Legends Ridge Lot No. 815
14.0249RApprovedLPCSA. Bahour7/1/20147/3/2014Dunblane S/D (Revised)
14.0249DeniedLPCSA. Bahour5/5/2014-Dunblane S/D
13.0336ApprovedLINEPhil Simmo5/31/201310/11/2013Hart's Landmark Subdivision
12.0619ApprovedSTDSPECA. Bahour10/12/201211/9/2012Berry's Chapel Utility