Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Permits
Permit Information
Parent Site
Site ID
Site
Location
City
County
EFO Name
GIS
175913
Eastman Credit Union New Branch
1530 West Elk Ave
Elizabethton
Carter
Johnson City
View Map
Permit Information
Permit Number
TNR162293
Permit Type
CGP
Status
Inactive
Permittee Name
Eastman Credit Union
Project Name
Eastman Credit Union New Branch
Activity Description
Construction of a new branch location to include grading, stormwater, utilities, parking, and building
Permit Rating
N/A
Facility Classification
Application Received
26-MAY-2023
Application Returned
Application Complete
26-MAY-2023
Public Notice Date
Issuance Date
Effective Date
02-JUN-2023
Expiration Date
30-SEP-2026
Modification Date
Termination Date
31-JUL-2024
Receiving Stream
Watauga River
Effluent Description
Treatment Description
SIC Code
SIC 2
SIC 3
SIC 4
Design Flow Rate [MGD]
Record Last Updated
31-JUL-2024 07:18AM
Other DWR permits at this site
Go
Actions
No other permits found.
Column Actions
Search
Permit Documents
Search All Documents
FileNet Documents
View
File Type
Description
Document Date
Email
NOT receipt Confirmation email
31-JUL-2024
Notice of Termination
NOT
24-JUL-2024
Inspection Report
Inspection
26-APR-2024
Letter
Annual Maintenance Fee Notice Letter
18-APR-2024
Notice of Coverage (NOC)
Notice of Coverage
02-JUN-2023
Engineering Calculations
Storm Water Design Report
25-MAY-2023
Engineering Drawings-Plans
Drainage Area
25-MAY-2023
Engineering Drawings-Plans
Notice of Intent
25-MAY-2023
Engineering Drawings-Plans
EPSC
25-MAY-2023
SWPPP
SWPPP
25-MAY-2023
row(s) 1 - 10 of 11
Next
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.
Inspections
Inspection Date
Type
Result
25-APR-2024
Stormwater Construction Non-Sampling
In Compliance
29-JUL-2024
Stormwater Construction Non-Sampling
In Compliance
row(s) 1 - 2 of 2
CGP - Specific Information
Area Disturbed (acres)
1.31
Start Date
6/2/2023
Estimated End Date
3/31/2024
Streams
No
Wetlands
No
Exceptional TN Waters (ETW)
Yes
ETW Comment
-
Threatened and Endangered Species 1 mile radius
Yes
Threatened and Endangered Species 5 miles downstream
No
Unavailable Conditions Waters
No
Unavailable Conditions Waters Comment
-
EPSC Plan Findings
-
Contractors
Contractor 1
GRC Construction
Start Date
6/2/2023
Contractor 2
-
Start Date
-
Contractor 3
-
Start Date
-
Contractor 4
-
Start Date
-
Contractor 5
-
Start Date
-
Contractor 6
-
Start Date
-