Site IDSiteLocationCityCountyEFO Name
5059Portland STP124 Morningside DrivePortlandSumnerNashville

Permit Information

TN0021865
Individual
Reissuance
City of Portland
Portland STP
Upgrading the treatment systems by adding 2 SBRs for a total of 4 SBRs to increase the capacity from 1.9 to 2.85 MGD. The new design will not increase loads of oxygen demanding pollutants and incidental degradation is justified by the applicant.
M
M
MW
09-JUL-2024
03-JUL-2024
10-JUL-2019
06-AUG-2019
01-DEC-2019
01-JAN-2020
31-AUG-2024
Summers Branch at mile 8.6 to the Red River
treated municipal wastewater from Outfall 001
Sequencing Batch Reactor (SBR) activated sludge with chlorination, dechlorination, and post aeration. Sludge: was, imhoff, to land appl.
4952
2.85
11-JUL-2024 07:55AM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR246722City of Portland, Tennessee2020 Wastewater Treatment Plant ExpansionCGPActiveN/ANashville-10-JUL-202330-SEP-2026
TNB021865Portland STP-BiosolidsIncompleteN/ANashville---
  • 1 - 2 of 2

Permit Documents

View
Letter Portland Pretreatment Audit Inspection report08-NOV-2016
Notice of Violation09-SEP-14 PCI & 15-JUN-15 SAR letter 19-JUN-2015
Form09-SEP-14 PCI form19-JUN-2015
Letter16-0239 PER Approval Letter09-DEC-2016
Letter16-0250 Approval letter13-JUN-2016
Engineering Calculations16-0250 Cover letter and Engineering Calculations30-MAR-2016
Letter16-0704 Letter20-SEP-2016
Letter16-0704 Ref20-SEP-2016
Letter16-0705 Approval letter27-SEP-2016
Email16-0705 E-mail String26-SEP-2016
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/I:Permit ViolationsCommissioner's OrderMoratorium on Connections see Item 8 under Order & Assessment Section (page 15).4/18/2017Active58

Inspections

19-DEC-2006Biosolids InspectionMinor Deficiency Noted
08-MAR-2010Compliance Biomonitoring (CBI)In Compliance
17-JUN-2024Compliance Eval (non-sampling) (CEI)Out of Compliance
18-AUG-2022Compliance Eval (non-sampling) (CEI)Out of Compliance
07-JUL-2020Compliance Eval (non-sampling) (CEI)Out of Compliance
24-MAR-2016Compliance Eval (non-sampling) (CEI)Out of Compliance
02-MAY-2012Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted
01-JUN-2007Compliance Eval (non-sampling) (CEI)NOV
09-DEC-2010Compliance Sampling (CSI)In Compliance
03-MAR-2021Follow-upOut of Compliance

Wastewater Engineering Plans Review

19.0252Review CompleteC&E ReviewSJH4/30/2019-Portland 2018 Annual CMOM Report
24.0325ApprovedCDRGO4/30/20245/20/2024Bracken Estates - Sanitary Sewer Plans
24.0289ApprovedCDMJB5/23/20245/23/2024Parkside Pointe SPS & Force main
24.0227ApprovedCDMJB4/1/20245/30/2024Parkside Pointe
24.0160ApprovedCDMJT3/1/20244/1/2024Sanitary Sewer Rehab of Portland Sudden Service
24.0148ApprovedCDJKM2/27/20245/3/2024Harbin Sandye Avenue - Sanitary Sewer Collection Plans
24.0015ApprovedCDTNH2/2/20242/5/2024N Harris Ln Sewer Extension
23.0747ApprovedCDTNH3/1/20243/26/2024HWY 52E No. 1 Lift Station Relocation
23.0629ApprovedCDTNH1/29/20241/29/2024Twin Lakes
23.0560ApprovedCDJKM2/26/20242/28/2024Richland Estates Subdivision – Sanitary Sewer Collection Plans