Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5136Shelbyville Power, Water & Sewerage System STP525 West Jackson StreetShelbyvilleBedfordColumbia

Permit Information

TN0024180
Individual
Reissuance
Shelbyville Power, Water & Sewerage System
Shelbyville STP
treatment of municipal sewage by activated sludge
M
M
MW
04-AUG-2023
29-AUG-2023
21-NOV-2023
27-DEC-2023
01-FEB-2024
31-JAN-2029
Duck River at mile 221.25
treated municipal wastewater from Outfall 001
Activated sludge treatment preceded by screening, grit removal, and primary clarification and followed by chlorination and step aeration. Sludge is thickened in aerobic digestors for land application or bed drying.
4952
6.5
22-OCT-2024 03:15PM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR058858Shelbyville Power Water and Sewerage Wastewater Treatment Plant-TMSPNo ExposureN/AColumbia08-MAY-201408-MAY-201414-MAY-2014
TNB024180Shelbyville STP-BiosolidsActiveN/AColumbia09-DEC-201909-DEC-201915-AUG-2024
  • 1 - 2 of 2

Permit Documents

View
ApplicationRCVD VIA EMAIL 04-AUG-23: part of NPDES app re: updated Table B from Madison McLaughlin04-AUG-2023
ApplicationRCVD VIA EMAIL 28-JUL-23: NPDES app by Jason Reese28-JUL-2023
ApplicationApplication for Permit Renewal06-APR-2018
ApplicationRCVD 09-JUL-13: NPDES app by David Crowell.09-JUL-2013
Draft Permitdraft permit 202321-NOV-2023
Draft Permitdraft permit 201830-NOV-2018
Draft PermitTN0024180 2013 Draft Permit09-OCT-2013
EmailPT Narrative Conditions Reminder02-APR-2024
Email22.0176 Initial Review07-APR-2022
EmailMyTDEC Forms Req Notification - Event Form13-MAY-2021
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Watch List50
Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to the sewer manhole at Pickle Street 17-B due to more than 5 overflows within a 12 month period.12/7/2020Active
Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to 1913 Wartrace Pike due to more than 5 overflows within a 12 month period.4/9/2024Active

Inspections

03-APR-2024Pretreatment TAV and File ReviewIn Compliance
06-DEC-2023Performance Audit (PAI)In Compliance
05-APR-2023Pretreatment Compliance (oversight)In Compliance
14-DEC-2022Compliance Sampling (CSI)In Compliance
15-JUN-2022Pretreatment AuditIn Compliance
15-DEC-2021Compliance Eval (non-sampling) (CEI)In Compliance
28-APR-2021Pretreatment TAV and File ReviewIn Compliance
04-JUN-2020Pretreatment Compliance (oversight)In Compliance
12-DEC-2019Compliance Eval (non-sampling) (CEI)In Compliance
25-SEP-2019Performance Audit (PAI)In Compliance

Wastewater Engineering Plans Review

24.0644ApprovedCDMJT8/20/20249/23/2024Stonegate Estates Phase 3
24.0662ApprovedCDRGO8/24/238/28/2024Midtown Estates Phase 2
24.0632InactiveCDRGO8/24/158/26/2024Rabbit Lane Subdivision
24.0399ApprovedCDMJT5/20/20248/3/2024MTSU Academic Facility Sewer Improvements
24.0355ApprovedCDRGO5/6/20245/15/2024Global Manor Phase 10
24.0354ApprovedCDRGO5/6/20245/15/2024Global Manor Phase 9
24.0322ApprovedCDRGO4/29/20245/3/2024Lucas Road Subdivision
23.0750ApprovedCDMJT11/30/20233/1/2024Bedford County Higher Education Center
24.0051Review CompletePERTNH1/23/20242/9/2024Little Hurricane Creek Sewer Rehab - ARP
23.0649ApprovedCDJKM11/7/20231/2/2024D and D Subdivision Phase 3