Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
12588Water & Wastewater Authority of Wilson County - Sunset Harbor Treatment FacilityHidden Harbour DrMount JulietWilsonNashville

Permit Information

SOP-05019
SOP
Modification
Water and Wastewater Authority of Wilson County
Sunset Harbor Treatment Facility
Modification to expand current capacity of treatment system to accommodate future development. Treatment comprised of septic tanks, effluent collection system, recirculating sand filter and fenced drip irrigation. The expansion will add an additional RSF.
N/A
M
DI
28-JAN-2021
02-JAN-2020
03-FEB-2021
06-JUN-2023
28-JUN-2022
11-JUL-2023
30-JUN-2025
11-JUL-2023
N/A
No discharge allowed from this system
Septic tanks, effluent collection system, 2 recirculating sand filters, UV disinfection, and fenced drip irrigation
.038
28-OCT-2024 03:14PM

Other DWR permits at this site

No other permits found.

Permit Documents

View
Inspection ReportCEI drip field only26-AUG-2024
Inspection ReportCEI Drip Field Only19-AUG-2024
Letterengineering letter for Sunset Harbor As-Built drawings from SEC01-AUG-2024
Engineering Drawings-PlansAs-Built drawings submitted by SEC 7-31-202401-AUG-2024
Email2024 CRM Requirements- As-builts, fencing not confirmed01-AUG-2024
ReportOperation and Maintenance Inspection Schedule27-JUN-2024
Email45 day extension request for action item 7 "Submit a finalized, confirmed as-built with corrected installed, proposed, and available drip area for the entire permitted system"- Granted12-JUN-2024
ImageCRM Follow Up Requirement Construction Photos31-MAY-2024
EmailCRM Follow Up Second Round of Requirements30-MAY-2024
EmailCRM Follow Up Requirements first round action items07-MAY-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

16-DEC-2024Compliance AssistanceOut of Compliance
11-JUN-2024Compliance AssistanceOut of Compliance
18-APR-2024Compliance Evaluations (non-NPDES)Out of Compliance
09-JAN-2024Compliance Evaluations (non-NPDES)Out of Compliance
08-JAN-2024Compliance Evaluations (non-NPDES)Out of Compliance
20-APR-2023Follow-upOut of Compliance
28-MAR-2023Compliance Evaluations (non-NPDES)Out of Compliance
09-MAR-2021Follow-upOut of Compliance
26-JAN-2021Follow-upOut of Compliance
07-JAN-2021Follow-upOut of Compliance

Wastewater Engineering Plans Review

23.0120R2ApprovedCDRGO8/23/20238/27/2023Sunset Harbour Treatment Facility Addition (Revision of WPN 23.0120R)
23.0120RApprovedCDRGO4/6/20235/26/2023Sunset Harbour Treatment Facility Addition (Revision of WPN# 23.0120)
23.0120InactiveCDRGO3/3/20233/23/2023Sunset Harbour Treatment Faciltiy Addition
21.0053Review CompletePPDA. Sharp1/28/2021-Sunset Harbour
08.1104ApprovedRSFDIA. Bahour12/9/20081/22/2009Sunset HarborPhase IV Revisions
08.1067ApprovedLINEA. Bahour11/21/200812/2/2008Avalon Bay S/D(Formerly Wellington Pointe S/D WPC 08-0922)
08.0922ApprovedSTEPA. Bahour10/1/200810/27/2008Wellington Pointe S/D
07.1139ApprovedLINEA. Bahour7/10/20078/9/2007Sunset Harbor Phase IV
07.0486ApprovedRSFDIA. Bahour3/16/20077/31/2007Sunset HarborTreatment Facility(Sunset Harbor, Sailboat Harbor, Paddock Place, and Surrounding Area)
07.0228ApprovedLINEA. Bahour2/28/20074/2/2007Sunset Harbor Phase III S/D