Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5143Hallsdale Powell Utility District STP4301 West Beaver Creek DrivePowellKnoxKnoxville

Permit Information

TN0078905
Individual
Reissuance
Hallsdale Powell Utility District
Hallsdale Powell Utility District STP
Treatment of municipal wastewater and inflow and infiltration via parallel treatment trains and influent equalization and storage
M
M
MW
31-JUL-2023
01-AUG-2023
22-AUG-2023
02-OCT-2023
01-NOV-2023
30-SEP-2028
Beaver Creek at mile 23.5
treated municipal wastewater from outfall 001
6.0 MGD membrane biological reactor preceded by fine screens operating parallel with a 3.7 MGD oxidation ditch train followed by UV disinfection, and post aeration. Flow in excess of 11.9 MGD routed to storage for delayed treatment.
4952
9.7
23-DEC-2024 09:30AM

Other DWR permits at this site

  • 1 - 3 of 3
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNB024287Hallsdale Powell Utility District STP-BiosolidsInactiveN/AKnoxville---
TNR056667Hallsdale Powell Utility District STP-TMSPActiveN/AKnoxville19-JUL-202020-JUL-202030-JUN-2025
TN0024287Hallsdale Powell Utility District STP-IndividualInactiveMajorKnoxville31-MAR-200301-MAY-200331-MAR-2008
  • 1 - 3 of 3

Permit Documents

View
Letter15-0200CO Approval letter and Documents from SRF 06-APR-2016
Memo15-0200CO Change Order 1 from SRF10-MAR-2016
Memo15-0200CO to SRF28-MAR-2016
Memo15-0865-DWS Review Comment on Proposed Solids Handling Upgrade and SRF Cover Memo09-FEB-2016
Engineering Drawings-Plans15-0865R Cover Memo and Eng. Cover From SRF31-MAR-2016
Letter15-0865R Review Memo to SRF 19-AUG-2021
Memo15.0200CO4 Memo from SRF01-MAY-2017
Memo15.0200CO4 Memo to SRF22-MAY-2017
Memo15.0865 Plan Review19-DEC-2017
Engineering Drawings-Plans15.0865R Change Order 213-JUL-2017
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/IEFO CommunicationHDPUD acknowledged the existence of a Self-Imposed Moratorium (SIM) in a letter from Jacobs Engineering, July 7, 2015 requesting a waiver of the SIM based on approval of the CAP-ER. May 23, 2016, Compliance Enforcement approved the CAP-ER and included language "Implementation of CAP-ER will enable compliance with the self-imposed moratorium language in the NPDES Permit...". The CAP-ER requires HPUD to certify new connections based on hydraulic modeling. In a July 2019 meeting between KEFO and HDPUD, it was agreed that HDPUD would include a certifying statement in all plans submitted that hydraulic modeling had been done and validated the system can handle the added flows. Robert Ramsey email dated 4/16/194/17/2019Active58

Inspections

21-AUG-2024Sanitary Sewer SystemPending
29-MAY-2024Compliance Sampling (CSI)Pending
21-SEP-2022Compliance Eval (non-sampling) (CEI)In Compliance
18-AUG-2020Compliance Eval (non-sampling) (CEI)In Compliance
25-MAR-2019Compliance AssistanceIn Compliance
06-SEP-2018Compliance Eval (non-sampling) (CEI)In Compliance
08-JUN-2017Compliance Eval (non-sampling) (CEI)In Compliance
03-MAR-2016Compliance Eval (non-sampling) (CEI)In Compliance
26-MAR-2014Compliance Eval (non-sampling) (CEI)Order Requested
22-AUG-2013Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

24.0749PendingCDMJT9/26/202412/2/2024O.T. Tindell
24.0666PendingCDTNH8/26/202410/4/2024Bell Town Subdivison on W. Emory Road
24.0627PendingCDTNH8/14/20248/30/2024Dixon Springs Lane Low Pressure Sewer
24.0317PendingCDRGO4/25/20245/1/2024Neely Landing
24.0049PendingCDRGO1/22/20241/24/2024Vincent Landing Sewer Extension
24.0018PendingCDRGO1/8/20241/12/2024JW Construction on Brown Gap Rd (25507)
23.0655PendingCDMJT11/9/20233/18/2024Mesana Investments - Beeler Road
23.0520PendingCDJKM9/14/202310/5/2023Mayhew property subdivision
23.0509PendingCDMJT9/8/202310/10/2023Preserve at Hines Branch (25434-1)
23.0501PendingCDTNH9/6/202310/4/2023FY23-24 ARPA Funded Sewer Rehabilitation