Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
14886Town of Arlington Wastewater Treatment PlantNorth of CSX Railroad, West of Hwy 385, South of the Loosahatchie RiverArlingtonShelbyMemphis

Permit Information

TN0078603
Individual
Modification
Town of Arlington
Arlington WWTP (11150 Highway 70)
treatment of municipal wastewater using Sequencing Batch Reactor, ultraviolet disinfection and equalization/surge basin. Expanding design flow rate from 2.5 MGD to 5 MGD. The permittee determines that the greater than de minimis degradation is justified to support areawide growth out of both the Memphis metropolitan area and the Ford Blue Oval City and will not result in pollution.
M
M
MW
15-MAY-2024
04-JUN-2024
31-JUL-2024
06-SEP-2024
01-OCT-2024
30-NOV-2027
Loosahatchie River at mile 29.2
treated municipal wastewater from Outfall 001
4952
2.5
31-OCT-2024 08:10PM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR151751Town of Arlington-CGPInactiveN/AMemphis-30-SEP-2005-
TNB078603Town of Arlington-BiosolidsActiveN/AMemphis10-JUN-202210-JUN-202215-AUG-2024
  • 1 - 2 of 2

Permit Documents

View
Report April 2016 PT SAR22-APR-2016
Report Oct 2018 PT SAR23-OCT-2018
Letter11-12-20 TN0078603 Brown and Caldwell Ltr to Town regarding TIETRE12-NOV-2020
Letter11-13-20 TN0078603 Arlington Ltr to TDEC regarding TIETRE13-NOV-2020
Letter16-0144 Letter20-MAR-2019
Letter16-0144 Ref20-MAR-2019
Letter16-0144 Ref120-MAR-2019
Letter16-0180 Letter20-MAR-2019
Letter16-0180 Ref20-MAR-2019
Letter16-0302 Approval letter03-MAY-2016
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

01-AUG-2024Pretreatment AuditPending
06-MAR-2023Compliance Eval (non-sampling) (CEI)In Compliance
06-MAR-2023Pretreatment TAV and File ReviewIn Compliance
25-MAR-2022Pretreatment Compliance (oversight)In Compliance
05-MAY-2021Pretreatment TAV and File ReviewIn Compliance
22-FEB-2021Compliance Eval (non-sampling) (CEI)In Compliance
28-FEB-2020Pretreatment Compliance (oversight)In Compliance
08-AUG-2019Compliance AssistanceImmediately Corrected During Inspection
16-JUL-2019Pretreatment AuditIn Compliance
10-APR-2019Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

24.0452Pending-MJB6/10/20247/30/2024Standard Specifications for Sanitary Sewer Construction
24.0438InactiveCDRGO6/3/20246/17/2024Maybury Planned Development
24.0375PendingPERTNH5/15/20246/18/2024Arlington TN0078603 NPDES Permit Modification
24.0152PendingCDRGO2/28/20243/5/2024New DIDD West Tennessee Regional Office Facility
24.0007PendingCDMJT1/3/20245/15/2024White Oak 1st Addition Phase 18
23.0667PendingCDMJT11/16/202311/20/2023Scooter's Coffee Shop - Sewer Main Extension - Arlington, TN
21.0827RPendingCDMJT11/14/20231/3/2024Hall Creek Sewer Extension
23.0436Inactive-TNH8/11/2023-Lot 4A - Landvest Highway 70 Subdivision
23.0417PendingCDA. Bahour8/7/20239/6/2023Landvest Grading Improvement
23.0324PendingCDMJB6/20/20236/27/2023White Oak Phases 7 & 12