Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
20548Arrington Vineyards6211 PATTON RDARRINGTONWilliamsonNashville

Permit Information

SOP-11022
SOP
Reissuance
Arrington Vineyards
Domestic wastewater and winery waste to septic tank, (2) moving bed bioreactors (MBBR) with a Bioclere unit, UV disinfection, odor reduction and 0.65 acre drip irrigation (fenced)
N/A
X
DI
16-MAR-2022
25-APR-2022
26-APR-2022
28-JUN-2022
28-JUN-2022
30-NOV-2026
N/A
No discharge allowed from this system
Septic tank, effluent collection system, recirculating media filter, UV disinfection and 0.65 acre drip irrigation (fenced)
.003204
29-MAY-2024 01:55PM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR245095Arrington Vineyards, LLCArrington Vineyards Parking AdditionCGPActiveN/ANashville-09-JUN-202130-SEP-2026
TNR143928Firefly Vineyards-CGPInactiveN/ANashville-23-JUN-2006-
  • 1 - 2 of 2

Permit Documents

View
Form2017 Certified Operator Notification15-SEP-2017
Letter2023 NOV Response- All items corrected03-OCT-2024
Notice of Violation2024 CEI NOV- Failure of the permittee to maintain a minimum of 3 years of operational records, operating without a permit, inadequate recordkeeping in inspection records and sludge hauling records23-SEP-2024
Email6/18/2023, DWR, 10 gallons and was caused from a sump pump that stopped operating in the STEP tank20-JUN-2023
LetterArrington Vineyard's STEP System Design (Rural Retreat) Wastewater Collection, Treatment, and Subsurface Drip Dispersal Williamson County, TN SOP-11022 WPC 12-001230-NOV-2012
ApplicationArrington Vineyards SOP 11022 Renewal 2016 Application25-JUL-2016
LetterCertified Operator in Charge- Dan Martin17-SEP-2024
Draft PermitDraft Permit02-MAY-2022
Inspection ReportDrip Field Inspection January 202411-JAN-2024
PermitFinal Permit28-JUN-2022
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

28-AUG-2024Compliance Evaluations (non-NPDES)Out of Compliance
11-JAN-2024Compliance Evaluations (non-NPDES)Out of Compliance
05-AUG-2016Compliance Evaluations (non-NPDES)In Compliance

Wastewater Engineering Plans Review

12.0012ApprovedRSFDIA. Bahour1/11/20121/31/2012Arrington Vineyard