Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5133Cleveland Utilities STP1860 Old Lower River RoadClevelandBradleyChattanooga

Permit Information

TN0024121
Individual
Modification
Cleveland Utilities Authority (CUA)
Cleveland Utilities STP
Treatment of municipal sewage by ICEAS(TM) activated sludge process preceded by mechanical bar screening and grit removal and followed by disinfecting. Modification proposes changes associated with converting from chlorine disinfecting to disinfecting with ultraviolet light; Modification simultaneously updates the E. coli limit consistent with current state water quality standards.
M
M
MW
22-AUG-2024
26-AUG-2008
27-AUG-2024
03-SEP-2024
29-APR-2022
31-OCT-2023
30-APR-2027
03-OCT-2023
Hiwassee River at mile 15.4
treated municipal wastewater from Outfall 001
ICEAS(TM) activated sludge process preceded by mechanical bar screening and grit removal and followed by chlorination and dechlorination. Sludge is anaerobically digested, dewatered by centrifuge and land applied.
4952
21.6
29-OCT-2024 12:20PM

Other DWR permits at this site

  • 1 - 4 of 4
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
NR2101.017Cleveland UtilitiesCleveland Utilities Wastewater Support Building-2420 Guthrie Avenue NWARAPInactiveN/AChattanooga-23-MAR-202107-APR-2025
TNR058788Cleveland Utilities Authority (CUA)Cleveland Utilities STPTMSPNo ExposureN/AChattanooga---
TNB024121Cleveland Utilities Authority (CUA)-BiosolidsActiveN/AChattanooga27-SEP-201927-SEP-201915-AUG-2024
TNRX50143Cleveland Wastewater Treatment Facility-TMSPNo ExposureN/AChattanooga---
  • 1 - 4 of 4

Permit Documents

View
Report96-0194 Wastewater Plant Design Report01-MAR-1995
Model1997 Modeling Runs with Streeter Phelps28-APR-1997
Model2000 Modeling Runs with Streeter Phelps28-AUG-2000
Report Agreed Order30-JAN-2006
LetterEPA letter commenting that nitrogen and phosphorus monitoring should be added to permit due to Gulf hypoxia23-JAN-2009
ReportStream Monitoring Plan for Receiving Stream28-JUN-2010
ReportPERMIT APPLICATION CHECKLIST05-OCT-2011
EmailEPA emails regarding permit review08-FEB-2012
LetterCONSTRUCTION PLANS APPROVALS09-MAR-2012
ImageSPECS AND CONST DETAIL DRAWINGS - APPROVED13-APR-2012
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetterWildwood Basin Manhole 71-65 (22-DEC-09); Manhole 4-11 (03-JUL-19), and Manhole 10-1AA (03-JUL-19)12/22/2009Active56

Inspections

09-NOV-2006Pretreatment TAV and File ReviewIn Compliance
28-FEB-2007Compliance Eval (non-sampling) (CEI)In Compliance
11-DEC-2007Pretreatment Compliance (oversight)NOV
11-DEC-2008Pretreatment TAV and File ReviewIn Compliance
18-NOV-2009Pretreatment AuditNOV
09-DEC-2009Compliance Eval (non-sampling) (CEI)NOV
09-DEC-2009Sanitary Sewer Overflow Non-SamplingNOV
30-NOV-2010Pretreatment Compliance (oversight)In Compliance
27-DEC-2011Pretreatment TAV and File ReviewIn Compliance
27-DEC-2011Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

24.0755ApprovedCDRGO9/24/3010/16/2024Bible St. NE Sewer Extension
24.0647ApprovedCDRGO8/24/209/24/2024Young Road SE Sewer Extension
24.0649InactiveCDRGO8/24/208/28/2024Martin Drive Sewer Extension
24.0605ApprovedCDRGO8/24/68/24/2024Buchanan Circle SE Sewer Extension
24.0535Review CompleteCDTNH7/12/20247/31/2024Cleveland 2024 Sewer Rehabilitation Project
22.0643ApprovedCDMJB10/11/202211/4/2022Wilkinson Road PS Force Main
22.0543ApprovedCDMJB8/24/20229/23/2022Wilkinson Road Pump Station (650 GPM)
22.0299ApprovedCDMJB5/17/20226/9/2022Lankford Drive NW
21.0870Review CompleteCDTNH12/3/20211/12/2022SRF - Dalton Pike Sewer Replacement Project
21.0759RReview CompleteCDTNH10/1/202110/13/20212021 Rehabilitation Project