Site IDSiteLocationCityCountyEFO Name
12892Tennessee Wastewater Systems, Inc. - Eudailey Treatment FacilityCovington Eudailey RoadFranklinWilliamsonNashville

Permit Information

SOP-05036
SOP
Reissuance
Tennessee Wastewater Systems, Inc.
Eudailey Treatment Facility
Septic tanks, collection system, recirculating sand filter, membrane filter bioreactor & drip irrigation areas totaling 82.24 + acres to serve the Eudailey Treatment Facility.
N/A
M
DI
29-OCT-2020
23-AUG-2010
20-NOV-2020
08-DEC-2020
30-APR-2021
01-MAY-2021
30-APR-2026
N/A
No discharge allowed from this system
Septic tanks, effluent collection system, 0.12 MGD recirculating sand filter, 0.25 MGD membrane filter bioreactor and 48.2 acre fenced drip irrigation area.
.785
26-NOV-2024 11:31AM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR240641Tennessee Wastewater Systems, Inc.Eudailey-Covington Force Main and Reuse Main ExtensionCGPInactiveN/ANashville-28-APR-2016-
TNR145836Tennessee Wastewater Systems, Inc.-CGPInactiveN/ANashville-15-OCT-2007-
  • 1 - 2 of 2

Permit Documents

View
Inspection ReportCEI dripfield only29-JUL-2024
Inspection Report7-2-24 CEI dripfield only inspection. Returned to compliance29-JUL-2024
PermitOperation and Maintenance Inspection Schedule27-JUN-2024
ReportRCVD VIA EMAIL 01-MAY-23: report re: updated inspection frequency from Jenny Nichols01-MAY-2023
EmailDWR, Eudailey-Covington Road, Leaking valve, Photos attached to show clean up and repair25-APR-2022
Letter22.0161 Plans Approval LTR 2022040303-APR-2022
Letter22.0117 Plans Approval LTR_2022031212-MAR-2022
Monitoring Report4th Q MOR10-JAN-2022
Form21.0831 PPD Background Information02-NOV-2021
Letter21.0738 CD Approval 1013202113-OCT-2021
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

02-JUL-2024Compliance Evaluations (non-NPDES)In Compliance
01-FEB-2024Compliance Evaluations (non-NPDES)Out of Compliance
20-NOV-2019Compliance Evaluations (non-NPDES)Immediately Corrected During Inspection
05-MAR-2014Compliance Evaluations (non-NPDES)Minor Deficiency Noted
15-APR-2008Compliance Evaluations (non-NPDES)In Compliance
14-AUG-2007Compliance Evaluations (non-NPDES)In Compliance

Wastewater Engineering Plans Review

22.0161ApprovedCDRGO3/14/20224/3/2022The Eudailey Treatment Facility Addition Phase 1
22.0117ApprovedCDRGO3/2/20223/12/2022The Grove Sec 11 Eudailey Treatment Facility Modification
21.0738ApprovedCDTNH10/11/202110/13/2021The Grove Collection Lines
20.0074ApprovedCDARa2/12/20202/26/2020The Grove Phase 10
19.0466ApprovedCDARa8/7/20198/15/2019The Grove 6-B Subdivision - Eudalley Treatment Facility
18.0903ApprovedCDARa11/14/201811/27/2018Falls Grove S/D Phase 6 and 7
18.0714ApprovedCDARa8/13/20188/21/2018Lampkins Bridge Force Main & Reuse Main Extension
18.0285ApprovedLINEARa5/1/20185/3/2018McDaniel Estates Subdivision (Step System)
15.0183RApprovedSTEPARa6/7/20176/14/2017Vineyard Valley Subdivision (STEP System) - Revised
17.0348ApprovedSTEPARa5/25/20175/30/2017Eudaily treatment facility McDaniel Farms S/D