13280Tennessee Wastewater Systems, Inc. - Cedar Hill Treatment Facility4801 Jackson Road at Highway 41Cedar HillRobertsonNashvilleView Map

Permit Information

SOP-05039
SOP
Reissuance
Tennessee Wastewater Systems, Inc.
Cedar Hill Treatment Facility
Septic tanks, effluent collection system, recirculating sand filter and fenced drip irrigation system
N/A
M
DI
28-JUL-2020
17-APR-2013
21-AUG-2020
15-SEP-2020
14-DEC-2020
01-JAN-2021
31-DEC-2025
N/A
No discharge allowed from this system
Septic tanks, effluent collection system, recirculating media filter and fenced drip
.06
01-JUL-2024 11:10AM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
NR0804.207Adenus Solutions Group-ARAPInactiveN/ANashville01-JUL-200521-JUL-200830-JUN-2010
TNR143757Tennessee Wastewater Systems, Inc.Cedar Hill Treatment FacilityCGPInactiveN/ANashville-02-MAY-2006-
  • 1 - 2 of 2

Permit Documents

View
Notice of Violation07-JAN-11 CI & complaint (17318) investigation NOV04-FEB-2011
Report2012 Alan Rather UIC Inspection - documenting limiting karst features not compatible with spray irrigation10-AUG-2012
Notice of Violation27-JUL-12 CI citing violations10-SEP-2012
Inspection Report31-May-13, inspection report, new leakage problem03-JUN-2013
Corrective Action PlanAdenus response to 9/19/13 CAP review letter from Britton Dotson 18-DEC-2013
LetterAppeal of wetland plans denial01-DEC-2014
ReportCustomer water use records03-DEC-2010
Inspection ReportDWS inspection report, 2-Dec-1003-DEC-2010
Draft PermitDraft Permit25-SEP-2020
Engineering SpecificationsDrip Field As-Built01-OCT-2021
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

10-JAN-2024Compliance Evaluations (non-NPDES)In Compliance
08-JAN-2019Compliance Evaluations (non-NPDES)In Compliance
27-JUL-2012Compliance Evaluations (non-NPDES)NOV
07-JAN-2011Compliance Evaluations (non-NPDES)NOV
06-MAR-2007Compliance Evaluations (non-NPDES)In Compliance

Wastewater Engineering Plans Review

22.0129ApprovedCDTNH3/22/20223/28/2022Cedar Hill Baptist Church
21.0697ApprovedCDTNH12/6/202112/17/2021Gospel Street Sewer Line Addition
17.0210 RApprovedCDARa10/19/201810/22/2018Cedar Hill Treatment Facility
17.0210Approved-ARa3/21/20173/24/2017Cedar Hill Treatment Facility
08.0662ApprovedLINEA. Bahour6/30/20088/22/2008Jo Byrns High School