Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
14886Town of Arlington Wastewater Treatment PlantNorth of CSX Railroad, West of Hwy 385, South of the Loosahatchie RiverArlingtonShelbyMemphis

Permit Information

TN0078603
Individual
Modification
Town of Arlington
Arlington WWTP (11150 Highway 70)
treatment of municipal wastewater using Sequencing Batch Reactor, ultraviolet disinfection and equalization/surge basin. Expanding design flow rate from 2.5 MGD to 5 MGD. The permittee determines that the greater than de minimis degradation is justified to support areawide growth out of both the Memphis metropolitan area and the Ford Blue Oval City and will not result in pollution.
M
M
MW
15-MAY-2024
04-JUN-2024
31-JUL-2024
06-SEP-2024
01-OCT-2024
30-NOV-2027
Loosahatchie River at mile 29.2
treated municipal wastewater from Outfall 001
4952
2.5
31-OCT-2024 08:10PM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR151751Town of Arlington-CGPInactiveN/AMemphis-30-SEP-2005-
TNB078603Town of Arlington-BiosolidsActiveN/AMemphis10-JUN-202210-JUN-202215-AUG-2024
  • 1 - 2 of 2

Permit Documents

View
ReportWQ study of the Loosahatchie River21-FEB-2005
ImageFlood, May 201026-JAN-2010
Notice of ViolationNOV for 2nd QTR QNCR violations11-SEP-2014
ReportREF 17-SEP-14: DMR for August 2014 by Ed Haley.17-SEP-2014
ReportREF 17-OCT-14: DMR for September 2014 by Ed Haley.17-OCT-2014
Notice of ViolationCEI Report12-NOV-2014
ReportREF 17-NOV-14: DMR for October 2014 by Ed Haley.17-NOV-2014
LetterNOV Response Letter15-DEC-2014
ReportREF 18-DEC-14: DMR for November 2014 by Dickie Wiseman.18-DEC-2014
ReportAPR 2015 PT SAR20-APR-2015
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

01-AUG-2024Pretreatment AuditPending
06-MAR-2023Compliance Eval (non-sampling) (CEI)In Compliance
06-MAR-2023Pretreatment TAV and File ReviewIn Compliance
25-MAR-2022Pretreatment Compliance (oversight)In Compliance
05-MAY-2021Pretreatment TAV and File ReviewIn Compliance
22-FEB-2021Compliance Eval (non-sampling) (CEI)In Compliance
28-FEB-2020Pretreatment Compliance (oversight)In Compliance
08-AUG-2019Compliance AssistanceImmediately Corrected During Inspection
16-JUL-2019Pretreatment AuditIn Compliance
10-APR-2019Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

24.0452Approved-MJB7/29/20247/30/2024Standard Specifications for Sanitary Sewer Construction
24.0438ApprovedCDRGO6/3/20246/17/2024Maybury Planned Development
24.0375Review CompletePERTNH5/15/20246/18/2024Arlington TN0078603 NPDES Permit Modification
24.0295Review CompletePERTNH4/19/20245/16/2024New West 4th Street SRF Sewer Lift Station
24.0152ApprovedCDRGO2/28/20243/5/2024New DIDD West Tennessee Regional Office Facility
24.0007ApprovedCDMJT1/3/20245/15/2024White Oak 1st Addition Phase 18
23.0667ApprovedCDMJT11/16/202311/20/2023Scooter's Coffee Shop - Sewer Main Extension - Arlington, TN
21.0827RApprovedCDMJT11/14/20231/3/2024Hall Creek Sewer Extension
23.0417ApprovedCDA. Bahour9/6/20239/6/2023Landvest Grading Improvement
23.0436Inactive-TNH8/11/2023-Lot 4A - Landvest Highway 70 Subdivision