Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
14886Town of Arlington Wastewater Treatment PlantNorth of CSX Railroad, West of Hwy 385, South of the Loosahatchie RiverArlingtonShelbyMemphis

Permit Information

TN0078603
Individual
Modification
Town of Arlington
Arlington WWTP (11150 Highway 70)
treatment of municipal wastewater using Sequencing Batch Reactor, ultraviolet disinfection and equalization/surge basin. Expanding design flow rate from 2.5 MGD to 5 MGD. The permittee determines that the greater than de minimis degradation is justified to support areawide growth out of both the Memphis metropolitan area and the Ford Blue Oval City and will not result in pollution.
M
M
MW
15-MAY-2024
04-JUN-2024
31-JUL-2024
06-SEP-2024
01-OCT-2024
30-NOV-2027
Loosahatchie River at mile 29.2
treated municipal wastewater from Outfall 001
4952
2.5
31-OCT-2024 08:10PM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR151751Town of Arlington-CGPInactiveN/AMemphis-30-SEP-2005-
TNB078603Town of Arlington-BiosolidsActiveN/AMemphis10-JUN-202210-JUN-202215-AUG-2024
  • 1 - 2 of 2

Permit Documents

View
EmailArlington's response to October 2024 SAR correction request.31-OCT-2024
SpreadsheetCorrection to October 2024 SAR.31-OCT-2024
LetterExplanation of Permit Violations for August 202413-SEP-2024
PermitFinal permit; Issue 9/6/2406-SEP-2024
LetterPT PTL Twn Ltr 5 MGD08-AUG-2024
Draft PermitDraft permit; PN 7/30/2431-JUL-2024
Letter24.0452 Approval letter 2024073030-JUL-2024
LetterWPN24.0375 PER ESU Acceptance Letter 2024061818-JUN-2024
Letter24.0438 Plans Approval LTR 2024061717-JUN-2024
ApplicationRCVD VIA EMAIL 15-MAY-24: Form 2A w/ rqst for mod from 2.5MGD to 5.0MGD by Gilbert Rivera15-MAY-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

15-MAY-2008Pretreatment Compliance (oversight)In Compliance
08-DEC-2008Compliance Eval (non-sampling) (CEI)In Compliance
06-APR-2010Pretreatment Compliance (oversight)In Compliance
07-DEC-2010Compliance Eval (non-sampling) (CEI)In Compliance
19-APR-2011Pretreatment TAV and File ReviewIn Compliance
08-MAY-2012Pretreatment Compliance (oversight)In Compliance
31-OCT-2012Compliance Eval (non-sampling) (CEI)In Compliance
31-OCT-2012Compliance Sampling (CSI)In Compliance
06-MAY-2013Pretreatment TAV and File ReviewIn Compliance
21-MAY-2014Pretreatment AuditNotice of Deficiency

Wastewater Engineering Plans Review

24.0452Approved-MJB7/29/20247/30/2024Standard Specifications for Sanitary Sewer Construction
24.0375Review CompletePERTNH5/15/20246/18/2024Arlington TN0078603 NPDES Permit Modification
24.0438ApprovedCDRGO6/3/20246/17/2024Maybury Planned Development
24.0295Review CompletePERTNH4/19/20245/16/2024New West 4th Street SRF Sewer Lift Station
24.0007ApprovedCDMJT1/3/20245/15/2024White Oak 1st Addition Phase 18
24.0152ApprovedCDRGO2/28/20243/5/2024New DIDD West Tennessee Regional Office Facility
21.0827RApprovedCDMJT11/14/20231/3/2024Hall Creek Sewer Extension
23.0667ApprovedCDMJT11/16/202311/20/2023Scooter's Coffee Shop - Sewer Main Extension - Arlington, TN
23.0417ApprovedCDA. Bahour9/6/20239/6/2023Landvest Grading Improvement
23.0293ApprovedCDA. Bahour7/24/20237/24/2023MemDent Office Buildings