Permit Information

TN0024988
Individual
Reissuance
Town of Alamo
Alamo STP
Treatment of municipal sewage via oxidation ditch activated sludge plant with chlorination and dechlorination
I
M
MW
24-JAN-2022
14-FEB-2018
02-FEB-2022
28-JUN-2022
28-JUL-2022
01-AUG-2022
31-JUL-2027
Unnamed tributary to Buck Creek at mile 4.5 then to the Forked Deer at mile 118
treated municipal wastewater from Outfall 001
Oxidation ditch activated sludge plant with chlorination and dechlorination
4952
.4
08-JUL-2024 03:49PM

Other DWR permits at this site

Permit Documents

View
LetterWPN24.0315 Approval Letter 2024052222-MAY-2024
MemoWPN24.0213 ARP Memo 2024041515-APR-2024
Inspection ReportAlamo STP CEI 202323-MAY-2023
FormPT Industrial Waste Survey IWS14-MAR-2023
PermitTN0024988 Final Permit28-JUL-2022
Draft PermitTN0024988 Draft Permit 202228-JUN-2022
ApplicationRenewal Application24-JAN-2022
Form21.0822 Fee Worksheet15-NOV-2021
Email21.0822 initial review email15-NOV-2021
Letter21.0822 Utility Approval letter29-OCT-2021
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

22-JUL-2009Compliance Sampling (CSI)Follow-up Inspection Required
23-JUL-2009Reconnaissance (RI)Minor Deficiency Noted
31-JUL-2009Reconnaissance (RI)Follow-up Inspection Required
20-AUG-2009Follow-upFollow-up Inspection Required
16-DEC-2009Pretreatment TAV and File ReviewFollow-up Inspection Required
22-APR-2010Reconnaissance (RI)Minor Deficiency Noted
24-JUN-2010Reconnaissance (RI)Minor Deficiency Noted
04-MAR-2011Reconnaissance (RI)Minor Deficiency Noted
04-AUG-2011Reconnaissance (RI)In Compliance
22-FEB-2012Reconnaissance (RI)Minor Deficiency Noted

Wastewater Engineering Plans Review

93.888ApprovedSTDSPECSPW11/18/199312/10/1993STD SPECS
13.0273Review CompletePERJMS5/29/20137/3/20132013 CDBG - Sewer System Improvements of Alamo WWTP
24.0213Review CompletePERTNH3/25/20244/15/2024Town of Alamo Wastewater Collection System Improvements - PER
24.0315ApprovedCDTNH4/24/20245/22/2024City of Alamo - 2024 Sewer System Rehabilitation
95.0987InactiveER-11/6/1995-1996 CDBG SEWER SYSTEM IMPRV.
23.0485Review CompleteC&E ReviewTNH9/5/2023-Alamo Updated CAP
21.0822InactiveCDMJB10/15/2021-Mallard Point Subdivision
21.0751InactiveCDTNH10/6/2021-Alamo Sewer System 2020 CDBG
21.0608Review CompleteCAP/ERRGO8/4/2021-CORRECTIVE ACTION PLAN/ENGINEERING REPORT (CAP/ER)
20.0683Review CompletePPDAWJ11/11/2020-Alamo Sewer System 2020 CDBG