Permit Information

TN0074900
CAFO-Individual
Reissuance
G3 D Farms
FKA SIx T's Farm
Five barn hog operation holding 960 head each, 4,800 total head capacity. Copy of application/NMP available at NCO, EFO or TDA Ellington Ag Center.
I
R
14-SEP-2022
18-FEB-2021
26-SEP-2022
18-OCT-2022
13-JAN-2023
01-FEB-2023
31-JAN-2028
Cypress Creek
overflow of process wastewater from a facility designed, constructed, operated, and maintained to contain all process-generated wastewater plus the runoff from a 25-year, 24-hour rainfall event
single cell lagoon with 12.2 million gallon capacity
0213
07-SEP-2023 02:20PM

Other DWR permits at this site

No other permits found.

Permit Documents

View
ApplicationTurbeville Finishers OMUPlan August 199704-SEP-2013
ApplicationTurbeville Finishers Design Drawings from July 199704-SEP-2013
Report2014 Annual Report Six T's Farm03-SEP-2015
Inspection Report9-3-15 Six T's Farms CEI Inspection Documents08-SEP-2015
ApplicationRCVD CAFO permit renewal application sent by Mike Turbeville/J.T. Workman to TDA on 01/22/16 (rcvd 01/25/16 due to State office closures for inclement weather).22-JAN-2016
Notice of DeficiencySENT Needs Letter sent by TDA to Mike Turbeville (TSP copied via email) on 02/01/16.01-FEB-2016
ReportRCVD 2015 CAFO Annual Report sent by Mike Turbeville/J.T. Workman to TDA via DropBox rcvd 02/10/16.10-FEB-2016
ApplicationRCVD FINAL CAFO permit renewal application sent by Michael Turbeville/J.T. Workman to TDA rcvd 02/16/16.16-FEB-2016
FormSENT Approval form and final checklist for Six T's Farm renewal application sent by TDA to TDEC on 02/16/16.16-FEB-2016
LetterSENT Notice of Complete Application/Approval Form sent by TDA to Michael Turbeville (TSP copied via email) on 02/16/16.16-FEB-2016
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

26-JAN-2023CAFO Non-SamplingIn Compliance
02-AUG-2018CAFO Non-SamplingIn Compliance
03-SEP-2015CAFO Non-SamplingIn Compliance
20-APR-2011CAFO Non-SamplingMinor Deficiency Noted
14-JUL-2009CAFO Non-SamplingIn Compliance
06-MAY-2008CAFO Non-SamplingIn Compliance
23-JAN-2007CAFO Non-SamplingIn Compliance
14-FEB-2006CAFO Non-SamplingIn Compliance
16-OCT-2012Compliance Eval (non-sampling) (CEI)In Compliance
01-MAY-2012Reconnaissance (RI)In Compliance