Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5255City of Lebanon Gasification Plant dba Lebanon Waste Water Treatment Plant321 Hartmann DriveLebanonWilsonNashville

Permit Information

TN0028754
Individual
Reissuance
City of Lebanon
Lebanon POTW
Treatment of municipal sewage by conventional activated sludge preceded by flow equalization, mechanical screening and grit removal and followed by ultraviolet disinfection.
M
M
MW, RU
19-DEC-2023
16-JAN-2024
16-APR-2024
24-JUN-2024
01-AUG-2024
31-MAY-2029
Cumberland River (Old Hickory Reservoir) at mile 252.2
treated municipal wastewater from Outfall 001
4952
10
13-AUG-2024 07:20AM

Other DWR permits at this site

  • 1 - 3 of 3
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR146287City of Lebanon, Dept. of Public Works-CGPInactiveN/ANashville-22-APR-2008-
NR1804.078City of Lebanon, Dept. of Public WorksBlaire Lane Sewer UpsizeARAPInactiveN/ANashville-10-MAY-201806-APR-2020
TNB028754Lebanon STP-BiosolidsActiveN/ANashville15-APR-202015-APR-202015-AUG-2024
  • 1 - 3 of 3

Permit Documents

View
SpreadsheetPT PTL Documents11-APR-2024
Spreadsheet"Assuming that the receiving stream low flow is unchanged from the previous permit cycle, calculations you submitted do confirm that expansion will not degrade water quality beyond 5% of the assimilative capacity, making it de minimis per our rules."04-MAR-2024
Spreadsheet9-13-16 eMOR file13-SEP-2016
Report2021 NOV and CRM Requirement- BOD Study 90 day extension05-JAN-2023
ReportPT Apr 2022 SAR14-JUN-2022
ReportPT Oct 21 SAR28-OCT-2021
Report Overflow, 529 Holt Rd (Bartons Creek)04-AUG-2021
ReportPT Apr 21 SAR20-APR-2021
ReportOverflow report, MH @ WWTP behind EQ tank (Bartons Creek)31-MAR-2021
ReportOverflow/release reports, M/Hs 8122 and 8124 at 212 Bartonwood Dr., MH 5860 at 514 W.Spring St., MH 10500 at N. Maple and W. Market St. (Sinking Creek), MH 6748 at 121 Hammond Ave. 28-MAR-2021
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/ILetterSelf Imposed Moratorium, Spoke with Regina Santana at the city. The facility has been allowed to add to collection system at a rate based on the reduction in flow as a result of rehabilitation work. The main plant was also expanded. - JAH 3/4/2016 The facility submitted in May 2016 the 2015 status report which stated that they did not have five overflows in the same location since 2011. The order was closed officially on 15-SEP-16. The city is not on a moratorium. JAH 9/22/2016 9/22/2016Watch List66

Inspections

30-JUN-2024Compliance AssistanceIn Compliance
09-FEB-2024Performance Audit (PAI)In Compliance
09-FEB-2024Compliance Biomonitoring (CBI)In Compliance
29-MAR-2023Pretreatment Compliance (oversight)In Compliance
07-MAR-2022Pretreatment AuditOut of Compliance
25-JAN-2022Compliance Eval (non-sampling) (CEI)Out of Compliance
30-JAN-2020Compliance Eval (non-sampling) (CEI)Out of Compliance
07-JAN-2020Pretreatment Compliance (oversight)Out of Compliance
29-MAR-2019Pretreatment TAV and File ReviewIn Compliance
01-DEC-2017Sanitary Sewer Overflow Non-SamplingIn Compliance

Wastewater Engineering Plans Review

24.0591ApprovedCDRGO7/24/308/23/2024Rockdale VIII
23.0749RApprovedCDMJT7/9/20248/15/2024Hamilton Springs Retail Center: REVISED PLANS
24.0527ApprovedCDMJB7/10/20248/12/2024Woodbridge Glen Phases 3-4
24.0447ApprovedCDMJT6/6/20248/7/2024Summercrest Sewage Pump Station Replacement
24.0457ApprovedCDMJT6/11/20248/6/2024Barton Village Phase 3
24.0487ApprovedCDMJB6/24/217/30/2024HWY 109 Warehouses
24.0343ApprovedCDMJB5/24/67/25/2024Farmington Woods Pump Station Abandonment
24.0357ApprovedCDMJT5/9/20247/22/2024Timber Ridge Pump Station Upgrades
24.0517ApprovedCDRGO7/24/57/15/2024LOT 1A- ALVIN FLIPPEN PROPERTY
24.0508InactiveCDRGO7/24/27/9/2024Project Soaring Eagle Sewer