182170Columbia Highway Water MainColumbia HighwayThompson's StationWilliamsonNashvilleView Map

Permit Information

NR2404.193
ARAP
Utility Line Crossings
Pending
When initially received, all applications are identified as "Pending." Pending status indicates that the application is in the que to be processed or that TDEC-DWR staff are reviewing the application (or Notice of Intent for general permits). Status "Pending" could be also interpreted as "work in progress."
HB & TS Utility District
Phase 1
HB & TS Utility District proposes the installation of approximately 11,800 lineal feet of 24" & 20" Class 350 ductile iron water transmission main line along Columbia Highway in Thompson's Station, Williamson County. During the course of this project, there will be two (2) water resource crossings. The proposed crossings are to be made by open cut utilizing appropriate erosion and sediment control best management practices in order to limit potential construction storm water pollution.
N/A
01-AUG-2024
01-AUG-2024
01-AUG-2024 11:31AM

Other DWR permits at this site

No other permits found.

Permit Documents

View
EmailIncomplete application notification 01-AUG-2024
Engineering Drawings-PlansApplication resubmittal / supplemental information01-AUG-2024
EmailResubmittal email01-AUG-2024
ImageFee Paid16-JUL-2024
ApplicationARAP 15-JUL-2024