Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Permits
Permit Information
Parent Site
Site ID
Site
Location
City
County
EFO Name
GIS
143759
UT SURGE Building and Ellington Building
2415 Fletcher Luck Lane
Knoxville
Knox
Knoxville
View Map
Permit Information
Permit Number
TNR135919
Permit Type
CGP
Status
Inactive
Permittee Name
John Sealy @
Project Name
UT SURGE Building and Ellington Building
Activity Description
Construction of two new educational buildings
Permit Rating
N/A
Facility Classification
Application Received
29-AUG-2019
Application Returned
Application Complete
16-SEP-2019
Public Notice Date
Issuance Date
Effective Date
16-SEP-2019
Expiration Date
30-SEP-2026
Modification Date
01-OCT-2021
Termination Date
03-OCT-2024
Receiving Stream
Tennessee River, Third Creek
Effluent Description
Treatment Description
SIC Code
SIC 2
SIC 3
SIC 4
Design Flow Rate [MGD]
Record Last Updated
04-OCT-2024 07:10AM
Other DWR permits at this site
Go
Actions
No other permits found.
Column Actions
Search
Permit Documents
Search All Documents
FileNet Documents
View
File Type
Description
Document Date
Email
Permit termination confirmation email
04-OCT-2024
Inspection Report
Trip Report
03-OCT-2024
Notice of Termination
NOT
20-SEP-2024
Letter
Annual Maintenance Fee Notice Letter
15-JUL-2024
Letter
notice letter
18-AUG-2023
Letter
CGP Notice
17-AUG-2021
Notice of Coverage (NOC)
Notice of Coverage
16-SEP-2019
Notice of Intent (NOI)
CGP
29-AUG-2019
row(s) 1 - 8 of 8
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.
Inspections
Inspection Date
Type
Result
03-OCT-2024
Stormwater Construction Non-Sampling
Out of Business
row(s) 1 - 1 of 1
CGP - Specific Information
Area Disturbed (acres)
3.285
Start Date
9/16/2019
Estimated End Date
12/31/2021
Streams
Yes
Wetlands
No
Exceptional TN Waters (ETW)
No
ETW Comment
-
Threatened and Endangered Species 1 mile radius
Yes
Threatened and Endangered Species 5 miles downstream
Yes
Unavailable Conditions Waters
Siltation and Habitat Alteration
Unavailable Conditions Waters Comment
-
EPSC Plan Findings
-
Contractors
no data found