Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5723Limestone Water Utility Operating Company, LLC (formerly Chapel Woods Homeowners Association)Highway 99Chapel HillMarshallColumbia

Permit Information

TN0062073
Individual
Reissuance
Limestone Water Utility Operating Company, LLC
Chapel Woods Subdivision STP
Treatment of domestic sewage via septic tank effluent gravity collection and an anaerobic upflow reactor with a nitrification tower. Disinfecting is by ultraviolet radiation and chlorination with dechlorination.
I
M
DW
03-SEP-2024
09-MAY-2013
04-SEP-2024
10-SEP-2024
31-JAN-2023
01-FEB-2023
30-SEP-2024
31-JAN-2023
Duck River at mile 177.5
treated municipal wastewater from Outfall 001
Septic tank effluent gravity collection, an anaerobic up flow reactor with the nitrification tower. Disinfection is by UV radiation and chlorination with dechlorination. Solids are returned to the anaerobic reactor, periodic transfer to POTW for disposal
4952
.05
10-SEP-2024 08:01AM

Other DWR permits at this site

No other permits found.

Permit Documents

View
ApplicationRCVD VIA EMAIL 03-SEP-24: cover letter, Form 1, Form 2E, flow diagram, and maps by Mandy Sappington03-SEP-2024
ApplicationRCVD VIA EMAIL 23-MAY-24: Form 1, Form 2E, flow diagram, and maps by Amanda Sappington23-MAY-2024
ApplicationTN0062073 Application29-MAR-2018
Draft PermitDraft Permit 202410-SEP-2024
Draft Permitdraft permit 202004-AUG-2020
EmailMyTDEC Forms Req Notification - Event Form07-SEP-2021
EmailEFO Report and Photos from Dye Trace Effort25-JAN-2018
Engineering Drawings-PlansOutfall Line Route to Duck River and Easement17-AUG-1987
Form2015 ICIS Entry Aug22-SEP-2015
FormRCVD 02-JUN-15: form re: ck# 5567 for $500 by Gale Campbell.02-JUN-2015
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

21-SEP-2023Compliance Eval (non-sampling) (CEI)In Compliance
17-JUL-2020Compliance Eval (non-sampling) (CEI)In Compliance
21-JUN-2018Compliance Eval (non-sampling) (CEI)In Compliance
25-AUG-2015Compliance Eval (non-sampling) (CEI)Out of Compliance
22-MAY-2014Compliance Eval (non-sampling) (CEI)CRM Requested
27-SEP-2013Compliance Eval (non-sampling) (CEI)NOV
29-SEP-2011Compliance Eval (non-sampling) (CEI)Notice of Deficiency
12-AUG-2009Compliance Eval (non-sampling) (CEI)In Compliance
17-MAY-2007Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

no data found