Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5079Lawrenceburg STP110 Ezell DriveLawrenceburgLawrenceColumbia

Permit Information

TN0022551
Individual
Reissuance
Lawrenceburg Utility Systems
Lawrenceburg STP
Treatment of municipal sewage
M
M
MW
02-JUN-2021
23-JUN-2021
21-DEC-2021
24-JAN-2022
01-FEB-2022
31-DEC-2026
Shoal Creek at mile 55.4
treated municipal wastewater from Outfall 001
Sequencing batch reactor (SBR) designed for continuous discharge with chlorine disinfecting
4952
4.5
22-APR-2024 10:25AM

Other DWR permits at this site

  • 1 - 1 of 1
  • 1 - 1 of 1

Permit Documents

View
LetterPlanning Limits for 6.0 MGD POTW28-AUG-2001
LetterMoratorium Letter19-MAY-2010
Form2011 PCI Form June15-JUN-2011
Letter2011 PCI June 22-JUN-2011
Letter2011 Moratorium for College Ave Sept 26-SEP-2011
LetterRcvd 27-OCT-11: response to imposition of a self-imposed moratorium by Kimberley Eakes.27-OCT-2011
ReportRCVD 27-OCT-11: POTW semi-annual report by Lisa Porter.27-OCT-2011
LetterSENT VIA EMAIL 24-FEB-12: letter re: NOCA by Wade Murphy.24-FEB-2012
Inspection Report2012 TAV May17-MAY-2012
Form2012 TAV Form May 17-MAY-2012
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetterSelf imposed moratorium on connections that flow to West Point Pump Station2/12/2018Active
Chronic OverflowsLetterSelf imposed moratorium on connections that ultimately flow to Garner Lane.2/25/2020Active
Chronic OverflowsLetterSelf imposed moratorium on connections that ultimately flow to at Veteran's Park.2/25/2020Active
Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Simms Street. 3/26/2020Active
Chronic OverflowsLetterSelf imposed moratorium on connections to the collections system that ultimately flow to Old Waynesboro Highway.3/30/2022Active
Chronic OverflowsLetterNo connections that would flow into the West Point Road Pump Station5/19/2010Closed53
Watch List53

Inspections

17-APR-2024Pretreatment Compliance (oversight)In Compliance
11-JUL-2023Pretreatment AuditIn Compliance
13-JUL-2022Compliance Eval (non-sampling) (CEI)In Compliance
02-JUN-2022Pretreatment TAV and File ReviewIn Compliance
08-SEP-2021Performance Audit (PAI)In Compliance
12-MAY-2021Pretreatment Compliance (oversight)In Compliance
08-JUL-2020Compliance Sampling (CSI)In Compliance
13-APR-2020Pretreatment TAV and File ReviewIn Compliance
08-AUG-2019Compliance Eval (non-sampling) (CEI)In Compliance
16-APR-2019Pretreatment Compliance (oversight)In Compliance

Wastewater Engineering Plans Review

22.0314Review CompleteCAP/ERRGO5/12/2022-Lawrenceburg CS- CAP
24.0193ApprovedCDRGO3/18/20243/27/2024Liberty Avenue Sewer Extension
23.0740ApprovedCDA. Bahour12/4/20231/2/2024Sanitary Sewer Extension - North Locust Avenue
23.0582ApprovedCDA. Bahour11/16/202312/14/2023Hampton Inn
23.0352ApprovedCDA. Bahour7/6/20238/4/2023Lawrenceburg Utility Systems - Standard Sewer Specifications
22.0293ApprovedCDMJB5/5/20225/17/2022North Locust Sewer Extension
21.0045ApprovedCDMNU2/16/20212/18/2021Willow Grove Subdivision
20.0572ApprovedCDA. Bahour9/22/202010/20/2020Slater Estates Subdivision
20.0544ApprovedCDMNU8/31/20209/23/2020Sanitary Sewer Extension to Gulley Subdivision
20.0242ApprovedCDA. Bahour4/28/20204/28/2020Best Western Hotel Sewer Extension