Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5785Sevierville (McCroskey Island) STP2295 McCroskey Island RoadSeviervilleSevierKnoxville

Permit Information

TN0063959
Individual
Reissuance
City of Sevierville
McCroskey Island STP
Treatment of municipal sewage; The permit imposes conditions for the current 4.8 MGD design capacity and for planned 8.4 and 12.8 MGD treatment system upgrades.
M
M
MW
01-NOV-2024
08-NOV-2024
19-NOV-2024
01-APR-2020
01-MAY-2020
30-APR-2025
French Broad River Mile 26.75
treated municipal wastewater from Outfall 001
WAS to aerobic digester to centrifuge to co-compost
4952
4.8
15-NOV-2024 06:05PM

Other DWR permits at this site

  • 1 - 4 of 4
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR136828City of SeviervilleMcCroskey Island WWTP ExpansionCGPActiveN/AKnoxville-27-JUN-202230-SEP-2026
TNRX50164McCroskey Island WWTP-TMSPNo ExposureN/AKnoxville---
TNB063959Sevierville McCrosky Island STP-BiosolidsInactiveN/AKnoxville---
TNR133027Sevierville Water Department-CGPInactiveN/AKnoxville-01-APR-2008-
  • 1 - 4 of 4

Permit Documents

View
Draft PermitDraft permit; PN 11/19/2419-NOV-2024
LetterPT PTL Town Ltr - Corrected05-NOV-2024
SpreadsheetPT PTL Documents - Corrected 05-NOV-2024
ApplicationRCVD VIA EMAIL 01-NOV-24: updated app by Keith Malone01-NOV-2024
ApplicationRCVD VIA DOWNLOAD 28-OCT-24: Form 2A, map, and flow diagram, by Keith Malone28-OCT-2024
Letter24.0772 Plans Approval LTR 2024101616-OCT-2024
LetterWPN24.0604 Approval Letter 2024091719-SEP-2024
Letter24.0583 Approval letter 2024090505-SEP-2024
EmailPT Program Modification Proof of Adoption SUO ERP PC/LL09-AUG-2024
Letter24.0497 Plans Approval LTR 2024073131-JUL-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

OverflowsDirector's OrderThe Respondent shall make no further connections, line extensions, or allow increased flows to its wastewater collection system above any point in the collection system which has experienced 5 or more overflows in the previous 12-month period, except for those currently under construction, legally committed to, or necessitated by subsurface sewage disposal systems which, because of failure, pose a health hazard. Based upon correspondence from Wade Murphy and Rebecca Rush this provision is not applicable because there have not been more than 5 overflows at any point in the collection system--concurrence from Angela Jones. RGO 8/2/202010/4/2017Watch List61

Inspections

01-OCT-2021Pretreatment TAV and File ReviewIn Compliance
27-APR-2021Compliance Eval (non-sampling) (CEI)In Compliance
26-FEB-2021Pretreatment Compliance (oversight)In Compliance
05-FEB-2020Pretreatment TAV and File ReviewIn Compliance
07-MAR-2019Pretreatment Compliance (oversight)In Compliance
23-JUL-2018Compliance Biomonitoring (CBI)In Compliance
01-DEC-2016Pretreatment Follow-upIn Compliance
04-APR-2016Compliance Biomonitoring (CBI)In Compliance
10-DEC-2015Pretreatment Compliance (oversight)In Compliance
16-DEC-2013Pretreatment Compliance (oversight)In Compliance

Wastewater Engineering Plans Review

98.1140ApprovedLPSFMJTS10/21/19981/14/1999FAIRFIELD COMMUNIGOVERNOR'S CROSSING
10.0343ApprovedSTDSPECA. Bahour6/11/20107/15/2010Wastewater System Construction
13.0674ApprovedLINEMNU11/8/201312/18/2013Seven Oaks Mobile Home Park
14.0234ApprovedSTDSPECA. Bahour4/8/20146/3/2014City of Sevierville Standard Specifications
14.0871ApprovedPSA. Bahour11/25/20141/14/2015Highway 66 Pump Station
15.0136ApprovedLINEMNU3/2/20153/23/2015Vista At Hodges Bend
15.0326ApprovedLPSFMA. Bahour6/18/20156/19/2015Interstate 40 Industrial Park Utilities
15.0767ApprovedLINEMNU11/25/201512/15/2015Dolly Parton Highway Sewer
16.0788ApprovedPSFMMNU9/21/201610/4/2016Sevier Distilling Co.
16.0848Review CompleteCMOMSou. Fathi10/6/201611/9/2016Sevierville CMOM annual Report