Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5533Cornersville STP1880 New Ostella RoadCornersvilleMarshallColumbia

Permit Information

TN0061841
Individual
Reissuance
Lewisburg Water and Sewer Department (Cornersville)
Cornersville STP
Treatment of municipal sewage through 0.1 MGD sequential batch reactor with UV disinfection and cascade aeration
I
M
MW
28-MAR-2022
28-MAR-2022
16-AUG-2022
19-SEP-2022
01-DEC-2022
30-NOV-2027
Town Creek mile 0.9
treated municipal wastewater
A combined equalization/sludge holding basin, a sequential batch reactor (SBR), an ultraviolet disinfection chamber, and a cascade aeration unit
4952
.1
08-JUL-2024 03:49PM

Other DWR permits at this site

  • 1 - 2 of 2
  • 1 - 2 of 2

Permit Documents

View
ApplicationUpdate Application 202228-MAR-2022
ApplicationRenewal Application04-MAR-2022
ApplicationRCVD 21-APR-17: NPDES app by Trigg Cathey.21-APR-2017
Draft PermitDraft Permit 202216-AUG-2022
Draft PermitTN0061841 Permit Draft 2017 (Public Notice 9/26/2017)28-SEP-2017
EmailPT IWS Narrative Condition reminder15-FEB-2023
EmailMyTDEC Forms Req Notification - Event Form12-MAR-2021
EmailPermittee request to minor modify permit to correct overflow/release language04-APR-2019
Email2018 Optimizing Biological Process Mar15-MAR-2018
Email2017 Bypass Update Sept14-SEP-2017
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetterOverflows/releases at Flow Equalization Tank (FET)1/9/2019Active81

Inspections

01-AUG-2012Compliance Eval (non-sampling) (CEI)Follow-up Inspection Required
28-JUN-2024Performance Audit (PAI)In Compliance
19-APR-2023Compliance Eval (non-sampling) (CEI)In Compliance
24-JUN-2020Compliance Sampling (CSI)In Compliance
05-JUN-2019Performance Audit (PAI)In Compliance
25-JUL-2018Compliance Eval (non-sampling) (CEI)In Compliance
25-JUL-2017Compliance Eval (non-sampling) (CEI)In Compliance
07-JUL-2016Compliance Eval (non-sampling) (CEI)In Compliance
22-JUL-2015Compliance Sampling (CSI)In Compliance
06-AUG-2014Performance Audit (PAI)In Compliance

Wastewater Engineering Plans Review

16.0057Approved-Sou. Fathi1/21/20162/11/2016Cornersville WWTP Sludge handling Improvements
20.0018ApprovedCDMNU1/15/20202/4/2020The Trailz Section 1 Roadway Ext.
21.0510Approved-TNH6/25/20217/22/2021Polk Street Sewer Extension
23.0059ApprovedCDMJB1/31/20232/17/2023Saddle Trace Single Family - Sewer Phase 1 & 2 (116 lots)