Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5821Bridgestone Americas Tire Operations, LLC dba Warren Plant725 Bridgestone DrMorrisonWarrenCookeville

Permit Information

TN0064629
Individual
Reissuance
Bridgestone Americas Tire Operations, LLC
Warren County Facility
Manufacturing of truck and bus radial tires from natural and synthetic rubber, carbon black, various pigments and steel cord.
I
P
NCCW, CCW, NPW
06-APR-2023
24-APR-2023
03-OCT-2023
10-NOV-2023
01-DEC-2023
30-JUN-2028
unnamed tributary at mile 0.1 to Plum (Crowfoot) Branch at mile 2.9
continuous boiler blowdown, boiler blowdown, softener backwash, cooling tower blowdown, air dryer drains, process oil tanks steam condensate, basement sumps, dome blowdown drain recovery tank from Outfall 001
3011
.4
23-JAN-2024 05:00PM

Other DWR permits at this site

  • 1 - 9 of 9
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR172540BridgestoneParking Lot ExpansionCGPIncompleteN/ACookeville---
NR2307.103BridgestoneParking Lot ExpansionARAPTransferN/ACookeville---
NRS23.314Bridgestone Americas Tire Operation, LLCBridgestone 3k ExpansionARAPIncompleteN/ACookeville---
TNR172487Bridgestone Americas Tire OperationsBridgestone - Warren Facility 3K ExpansionCGPActiveN/ACookeville-07-JUL-202330-SEP-2026
NR2307.11Bridgestone Americas Tire Operations, LLCBridgestone Warren Facility ExpansionARAPInactiveN/ACookeville23-FEB-202323-FEB-2023-
TNR172441Bridgestone Americas Tire Operations, LLCBridgestone Americas Tire Operations Warren Parts Storage BuildingCGPInactiveN/ACookeville-02-FEB-202330-SEP-2026
TNR053210Bridgestone Americas Tire Operations, LLCBridgestone Americas Tire Operations, LLC - WarrenTMSPActiveN/ACookeville19-JUL-202020-JUL-202030-JUN-2025
TNR172439Bridgestone Warren Plant ExpansionBridgestone Warren plant ExpansionCGPInactiveN/ACookeville-23-FEB-202330-SEP-2026
TNR172516Tim Painter, Bridgestone Americas Tire Operations, Plant ManagerBridgestone - Warren Plant Railyard ImprovementsCGPInactiveN/ACookeville-08-AUG-2023-
  • 1 - 9 of 9

Permit Documents

View
PermitFinal NPDES Permit 202310-NOV-2023
LetterRCVD VIA EMAIL 01-NOV-23: letter re: comments on Draft by Tim Painter01-NOV-2023
Draft PermitDraft NPDES Permit 202303-OCT-2023
ApplicationRCVD VIA DOWNLOAD 06-APR-23: NPDES app by Tim Painter06-APR-2023
LetterNotification of Alternate Authorized DMR Signatory- Terri Burnett01-NOV-2022
LetterNotification of Authorized DMR Signatory- Tim Painter01-NOV-2022
LetterPermit contact information01-NOV-2022
LetterCompliance Sampling Inspection letter 27-JUL-2022
ReportLab Report27-JUL-2022
FormUpdated Permit Contact Information15-MAR-2021
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

14-JUN-2022Compliance Sampling (CSI)In Compliance
08-AUG-2019Compliance Eval (non-sampling) (CEI)In Compliance
12-AUG-2014Compliance Eval (non-sampling) (CEI)In Compliance
03-FEB-2011Compliance Eval (non-sampling) (CEI)In Compliance
03-FEB-2011Stormwater Non-Construction Non-SamplingIn Compliance
25-MAY-2007Compliance Eval (non-sampling) (CEI)In Compliance
21-MAY-2006Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

24.0093Review CompletePPDTNH2/1/2024-Bridgestone Americas, LLC Warren Facility Expansion