Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
4919Clarksville Gas and Water dba Clarksville Wastewater Treatment Plant15 Quarry RoadClarksvilleMontgomeryNashville

Permit Information

TN0020656
Individual
Reissuance
City of Clarksville
Clarksville STP and Combined Sewer System
treatment of municipal wastewater and treated combined wastewater
M
M
MW
06-AUG-2024
05-AUG-2024
06-AUG-2024
29-SEP-2020
19-JAN-2021
01-FEB-2021
31-JAN-2025
Barkley Reservoir (Cumberland River) at miles 125.0, 125.4, and 126.2
municipal and treated combined wastewater from Outfall 001 treated by activated sludge preceded by rotary screening, grit removal and primary clarification and followed by clarification and chlorine disinfection, combined wastewater from Outfalls 002 (Gallows Hollow) and 006 (McClure Street combined sewer vortex separators) treated by grit removal and screening, and limited untreated combined wastewater from Outfall 004 (Commerce Street).
Activated sludge preceded by rotary screening, grit removal and primary clarification and followed by clarification and chlorine disinfection. Sludge is dewatered and disposed of in a municipal solid waste landfill.
4952
25
08-OCT-2024 09:20AM

Other DWR permits at this site

  • 1 - 5 of 5
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR245982City of ClarksvilleClarksville WWTP Thermal Dryer ImprovementsCGPActiveN/ANashville-26-MAY-202230-SEP-2026
TNR148062Clarksville Gas & Water Department-CGPInactiveN/ANashville-22-MAR-2012-
NR0904.194Clarksville Gas & Water DepartmentTrice's Landing Sewer Maintenance RoadARAPInactiveN/ANashville-23-FEB-201130-JUN-2015
TNB020656Clarksville STP-BiosolidsInactiveN/ANashville---
TNR056421Clarksville Wastewater Treatment Facility-TMSPNo ExposureN/ANashville27-AUG-201527-AUG-201514-APR-2020
  • 1 - 5 of 5

Permit Documents

View
Letter PTL town ltr 26-OCT-2020
Report(2) Overflow Reports - (1) New Meadowbrook L.S., MH-6723, unnamed stream to sinkhole, (2) Ringgold Rd. L.S. MH-18275, West Fork Creek12-FEB-2020
Report(2) Overflow Reports - (1) Ringgold Rd. L.S. MH-18275, West Fork Creek, (2) New Meadowbrook L.S., MH-6723, unnamed stream to sinkhole24-MAR-2020
Report(2) Overflow Reports, (8/28) Ringgold Rd. L.S., MH #18275, West Fork Creek, (8/29) Ringgold Rd. L.S., MH #18275, West Fork Creek28-AUG-2020
Report(2)Overflow Reports, Ringgold Rd. L.S., MH 18275, West Fork Creek; New Meadowbrook L.S., MH 6723, unnamed stream to sinkhole20-FEB-2019
Report(3) Overflow Reports, (1) New Meadowbrook L.S., MH-6723, unnamed stream to sinkhole, (2) Ringgold Rd. L.S., MH-18275, West Fork Creek, (3) Ringgold Rd. L.S., MH-18275, West Fork Creek11-FEB-2020
Report(3)Overflow Reports; River bottom by Cornell L.S., MH 1507, Red River; Sherwood L.S., Little Fork Creek; Oak St P.S., Red River20-FEB-2019
Form12-JUN-12 PCI form27-JUN-2012
Letter14-JUN-12 PCI letter27-JUN-2012
Environmental Review15.0708 Amendment03-MAY-2017
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

25-JUL-2024Pretreatment Compliance (oversight)In Compliance
22-NOV-2023Compliance AssistanceIn Compliance
26-JUL-2023CSO Inspection Non-SamplingIn Compliance
25-JUL-2023Compliance Eval (non-sampling) (CEI)In Compliance
18-APR-2023Pretreatment TAV and File ReviewIn Compliance
25-MAY-2022Pretreatment Compliance (oversight)In Compliance
23-SEP-2021CSO Inspection Non-SamplingIn Compliance
22-SEP-2021Compliance Eval (non-sampling) (CEI)In Compliance
05-MAR-2021Pretreatment AuditIn Compliance
13-APR-2020Pretreatment TAV and File ReviewIn Compliance

Wastewater Engineering Plans Review

24.0514ApprovedCDTNH8/28/20248/30/2024Project Columbus - LG Chem
24.0165ApprovedCDMJB3/5/20244/9/2024Fire Station Road Gravity Sewer Extension
24.0029ApprovedCDMJB2/12/20242/9/2024Old Ashland City Road Sewer System Improvements
23.0561Approved-MJT9/27/202310/18/2023Plantation Estates Sanitary Sewer Improvements
23.0372ApprovedCDTNH7/17/20238/8/2023Happy Hollow Force Main Upgrade
23.0314ApprovedCDMJB6/15/20237/14/2023Ringgold Road Wastewater Improvements
23.0322ApprovedCDMJB6/19/20236/27/2023Tylertown Road/Oakland Road sewer relocation
22.0738ApprovedCDMJB2/3/20232/3/2023Dunbar Cave Lift Station Improvements
22.0625ApprovedCDA. Bahour11/8/202211/10/2022Gravity Sewer Relocation - S.R. 76 (U.S 41 Bypass) Intersection at Denny Road/Rotary Park Drive
22.0641ApprovedCDA. Bahour10/10/202211/1/2022Standard Wastewater Specifications