Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
152759Ashland City Wastewater Treatment Facility199 Rhea StreetAshland CityCheathamNashville

Permit Information

TN0082252
Individual
New
Town of Ashland City
New STP located at 269 Tennessee Waltz Parkway
Treatment of municipal sewage; This new 2.0 MGD facility will replace the 0.8 MGD permitted via TN0020737. The permittee intends added treatment to maintain existing pollutant loads and concludes incidental degradation will be de minimis.
M
M
MW
19-JAN-2021
21-DEC-2020
21-JAN-2021
23-MAR-2021
27-APR-2021
01-MAY-2021
30-APR-2025
Cumberland River at mile 158
treated municipal wastewater from Outfall 001
Dual Sequencing Batch Reactors (SBR) preceded by rotary drum fine screening and followed by post flow equalization and sodium hypochlorite disinfecting. Biosolids will be aerobically digested and dewatered via a belt press.
4952
2
08-JUL-2024 03:49PM

Other DWR permits at this site

  • 1 - 4 of 4
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
NR2204.142Town of Ashland City-ARAPWithdrawnN/ANashville---
TNR246322Town of Ashland CityAshland City Wastewater Treatment FacilityCGPActiveN/ANashville-27-OCT-202230-SEP-2026
NR2204.268Town of Ashland CityAshland City WWTPARAPActiveN/ANashville-12-OCT-202207-APR-2025
NR2204.267Town of Ashland CityAshland City STP/WWTPARAPActiveN/ANashville-10-OCT-202207-APR-2025
  • 1 - 4 of 4

Permit Documents

View
Spreadsheet18.0909 Ashland City WWTP MOR data 201804-DEC-2018
Memo18.0909 Ashland City WWTP PPD 12/14/18 minutes 19-DEC-2018
Memo18.0909 Ashland City WWTP PPD 12/14/18 sign in sheet19-DEC-2018
Memo18.0909 Ashland City WWTP PPD Background information04-DEC-2018
Topo Map18.0909 Ashland City WWTP aerial map04-DEC-2018
Topo Map18.0909 Ashland City WWTP topo map04-DEC-2018
Inspection Report2023-2024 CEI - In compliance17-OCT-2024
Letter21.0295 Letter05-MAY-2021
Letter21.0295 Ref103-MAY-2021
Email90-day pre-operation notification agreed12-JUL-2021
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

18-SEP-2024Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

23.0777PendingCDMJT12/12/20237/1/2024CDBG 3X Pump Stations
22.0347ApprovedCDTNH6/16/20226/24/2022Waste Water Treatment Plant Improvements
21.0834ApprovedPP-ERTNH2/7/20223/2/2022Wastewater System Improvements
21.0295ApprovedCDMNU4/5/20215/3/2021Ashland Farms Apartments
19.0319ApprovedPERAWJ2/19/20202/21/2020Wastewater System Improvements
18.0909Review CompletePPDAWJ12/14/2018-Ashland City STP