Permit Information

TN0055026
Individual
Reissuance
City of Westmoreland
Westmoreland STP
Treatment of municipal sewage via sequencing batch reactor with post flow equalization, disk filtration, ultraviolet disinfecting, and post aeration.
I
M
MW
21-AUG-2024
08-AUG-2024
21-AUG-2024
27-AUG-2024
01-OCT-2024
01-NOV-2024
30-SEP-2029
Little Trammel Creek at mile 9.9
treated municipal wastewater from Outfall 001
Extended aeration / clarifier parallel with oxidation ditch / clarifier and then chlorination
4952
.3
01-OCT-2024 07:53AM

Other DWR permits at this site

  • 1 - 1 of 1
  • 1 - 1 of 1

Permit Documents

View
Permit2024 Final Permit with Addendum to Rationale at Permit Issue01-OCT-2024
Draft PermitDraft permit 202427-AUG-2024
ApplicationRCVD 21-AUG-24; NPDES Application from David Leath including effluent characterization21-AUG-2024
ApplicationRCVD APPLICATION 05-AUG-24 from David Leath via J. Penny Sutherland with lab sheets05-AUG-2024
LetterResponse to NOV dated 28-FEB-2426-MAR-2024
Notice of ViolationNOV for effluent violations on EPA's QNCR from September 2023 to January 202428-FEB-2024
SpreadsheetOperator Certification Rating Sheet for SBR POTW26-OCT-2023
Letter3-AUG-23 NOV Response Letter05-SEP-2023
EmailNotification of new STP startup scheduled for 28-AUG-2322-AUG-2023
Letter23.0349 Approval letter 2023081515-AUG-2023
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

06-MAR-2007Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted
19-JUN-2014Compliance Eval (non-sampling) (CEI)NOV
21-JUL-2010Performance Audit (PAI)NOV
05-JAN-2023Compliance Eval (non-sampling) (CEI)Out of Compliance
15-AUG-2018Compliance Eval (non-sampling) (CEI)Out of Compliance

Wastewater Engineering Plans Review

06.0669ApprovedSTDSPECMBS5/22/20066/15/2006Standard Specifications
20.0203Review CompletePERWDM3/23/20204/1/2020SRF-Contract 1-Wastewater Treatment Plant Improvements
18.0365Review CompleteCDWDM3/10/20204/1/2020SRF-Contract 1-Wastewater Treatment Plant Improvements
23.0298ApprovedCDA. Bahour6/8/20237/7/2023City of Westmoreland, TN Sewer Collection System Standard Specifications
23.0115ApprovedCDMJB8/2/20238/3/2023Pleasant Grove Farms Phase 1 Sewer
23.0349ApprovedCDMJB7/3/20238/15/2023Pleasant Grove Farms Phase 2
23.0426Incomplete-TNH8/8/2023-2022 ARPA Sewer Improvements - Westmoreland
22.0200Review CompletePPDTNH3/4/2022-Westmoreland WWTP Expansion
21.0896Review CompleteCDTNH1/31/2022-Westmoreland Screen Redesign
21.0659Review CompleteCMOMRGO8/26/2021-Westmoreland CMOM