6426T and T GilkeyGilkey Road ParisHenryJacksonView Map

Permit Information

TN0074888
CAFO-Individual
Reissuance
James Tosh
T and T Gilkey
Sixteen barn hog operation holding 960 head each, total capacity of 15,360 head.
I
R
03-JAN-2023
19-DEC-2022
06-FEB-2023
14-FEB-2023
20-APR-2023
01-AUG-2023
31-JUL-2028
Neil Ditch to Guins Creek
overflow of process wastewater from a facility designed, constructed, operated, and maintained to contain all process-generated wastewater plus the runoff from a 25-year, 24-hour rainfall event
three cell lagoon system with 27.6 million gallon capacity
0213
07-SEP-2023 02:20PM

Other DWR permits at this site

No other permits found.

Permit Documents

View
ApplicationTosh Farm-Gilkey Design Report July 199304-SEP-2013
Notice of DeficiencyCEI, Class I CAFO, 16,000 Finisher Hogs with3 lagoons.20-JUN-2014
ReportT and T Gilkey 2014 Annual Report02-MAR-2015
Report2015 Annual Report Gilkey T&T12-FEB-2016
Report2016 Annual Report T & T Gilkey14-FEB-2017
Inspection Report6-22-17 T and T Gilkey Inspection Documents28-JUN-2017
ReportAnnual Report 201712-FEB-2018
ApplicationRCVD CAFO Permit Renewal Application sent from Jamey Tosh to TDA 03/01/2018.05-MAR-2018
EmailSENT Notice of complete application and approval form sent from TDA to James Tosh (tsp copied via email) 03/21/2018.21-MAR-2018
FormSENT Final Checklist and Approval Form sent from TDA to TDEC 03/21/2018.21-MAR-2018
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

21-MAY-2021CAFO Non-SamplingIn Compliance
22-JUN-2017CAFO Non-SamplingImmediately Corrected During Inspection
29-MAR-2010CAFO Non-SamplingIn Compliance
11-MAR-2008CAFO Non-SamplingIn Compliance
27-SEP-2006CAFO Non-SamplingIn Compliance
17-JUN-2014Compliance Eval (non-sampling) (CEI)Notice of Deficiency
06-DEC-2005Compliance Eval (non-sampling) (CEI)NOV