5255City of Lebanon Gasification Plant dba Lebanon Waste Water Treatment Plant321 Hartmann DriveLebanonWilsonNashville

Permit Information

TN0028754
Individual
Reissuance
City of Lebanon
Lebanon POTW
Treatment of municipal sewage by conventional activated sludge preceded by flow equalization, mechanical screening and grit removal and followed by ultraviolet disinfection.
M
M
MW, RU
19-DEC-2023
16-JAN-2024
16-APR-2024
24-JUN-2024
01-AUG-2024
31-MAY-2029
Cumberland River (Old Hickory Reservoir) at mile 252.2
treated municipal wastewater from Outfall 001
4952
10
24-JUN-2024 03:55PM

Other DWR permits at this site

  • 1 - 3 of 3
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR146287City of Lebanon, Dept. of Public Works-CGPInactiveN/ANashville-22-APR-2008-
NR1804.078City of Lebanon, Dept. of Public WorksBlaire Lane Sewer UpsizeARAPInactiveN/ANashville-10-MAY-201806-APR-2020
TNB028754Lebanon STP-BiosolidsActiveN/ANashville15-APR-202015-APR-202015-AUG-2024
  • 1 - 3 of 3

Permit Documents

View
Permit2024 issued permit with addendum to rationale at permit issue24-JUN-2024
LetterWPN 24.0127 Approval Letter13-JUN-2024
Letter24.0262 Approval letter 2024052424-MAY-2024
Letter22.0505R Approval letter 2024051717-MAY-2024
LetterWPN 21.0042 Extension Letter 05.15.202415-MAY-2024
LetterRCVD VIA EMAIL 13-MAY-24: letter re: comments on Draft by Jeremiah Exum13-MAY-2024
Letter24.0216 Approval letter 2024050707-MAY-2024
Letter24.0285 Plans Approval LTR 2024042121-APR-2024
Draft PermitDraft permit 202418-APR-2024
SpreadsheetPT PTL Documents11-APR-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/ILetterSelf Imposed Moratorium, Spoke with Regina Santana at the city. The facility has been allowed to add to collection system at a rate based on the reduction in flow as a result of rehabilitation work. The main plant was also expanded. - JAH 3/4/2016 The facility submitted in May 2016 the 2015 status report which stated that they did not have five overflows in the same location since 2011. The order was closed officially on 15-SEP-16. The city is not on a moratorium. JAH 9/22/2016 9/22/2016Closed66

Inspections

30-JUN-2024Compliance AssistanceIn Compliance
09-FEB-2024Performance Audit (PAI)In Compliance
09-FEB-2024Compliance Biomonitoring (CBI)In Compliance
29-MAR-2023Pretreatment Compliance (oversight)In Compliance
07-MAR-2022Pretreatment AuditOut of Compliance
25-JAN-2022Compliance Eval (non-sampling) (CEI)Out of Compliance
30-JAN-2020Compliance Eval (non-sampling) (CEI)Out of Compliance
07-JAN-2020Pretreatment Compliance (oversight)Out of Compliance
29-MAR-2019Pretreatment TAV and File ReviewIn Compliance
01-DEC-2017Sanitary Sewer Overflow Non-SamplingIn Compliance

Wastewater Engineering Plans Review

24.0343PendingCDMJB6/7/2024-Farmington Woods Pump Station Abandonment
24.0285ApprovedCDRGO4/16/20244/21/2024DZ INVESTMENTS- SEWER EXTENSION
24.0262ApprovedCDMJB4/8/20245/24/2024Madison @ Township
24.0216ApprovedCDMJB5/6/20245/7/2024Bartons Mill Subdivision
24.0153ApprovedCDRGO2/28/20243/12/2024Lot 3, Hartmann Central - Sewer Extension
24.0133InactiveCDMJB2/20/2024-Woodbridge Glen Phase 3 Townhomes
24.0127ApprovedCDJKM5/13/20246/12/2024MANOR VIEW, SECTION 3 (SEWER)
24.0039ApprovedCDTNH1/17/20241/31/2024Cedartree Roadway & Infrastructure Plan
23.0799ApprovedCDA. Bahour12/19/20231/5/2024One Lebanon Place Phase 1
23.0794ApprovedCDMJT12/14/20231/29/2024Sewer Main Extension to Cumberland International Truck, Inc.