4912Smyrna STP100 Jack Hunter DriveSmyrnaRutherfordNashville

Permit Information

TN0020541
Individual
Reissuance
Town of Smyrna
Smyrna STP
Discharge of treated municipal wastewater by aerated activated sludge plant with UV disinfection; Reissuance imposes limits for existing 5.85 MGD facility as well as proposed increase to 9.0 MGD. The applicant will maintain existing loads to minimize degradation with incidental degradation justified by social and economic benefit.
M
M
MW
11-AUG-2021
11-AUG-2021
12-AUG-2021
14-SEP-2021
19-OCT-2021
01-DEC-2021
30-NOV-2026
30-SEP-2009
Stewart Creek at mile 5.65
treated municipal wastewater from Outfall 001 and distribution of treated municipal wastewater for non-potable reuse in irrigation.
Aerated activated sludge plant with UV disinfection. Reuse water system to go on line 6/2011. WAS to thickner to aerob dig to belt press to landfill.
4952
5.85
30-MAY-2024 08:58AM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNB020541Smyrna STP-BiosolidsActiveN/ANashville25-JUL-201425-JUL-201430-APR-2019
TNR242658Town of Smyrna2018 Wastewater Treatment Plant ExpansionCGPInactiveN/ANashville-25-JUN-201830-SEP-2026
  • 1 - 2 of 2

Permit Documents

View
Letter24.0466 Plans Approval LTR 2024062628-JUN-2024
LetterWPN24.0319 Approval Letter 2024052124-MAY-2024
Letter24.0404 Plans Approval LTR 2024052323-MAY-2024
Letter24.0379 Plans Approval LTR 2024052121-MAY-2024
Letter22.0403 Extension Letter 04.16.202417-APR-2024
Letter24.0135 Plans Approval LTR 2024041414-APR-2024
LetterWPN 22.0515 Extension Letter 03.20.202420-MAR-2024
LetterWPN23.0507 Approval Letter 2024022323-FEB-2024
Letter23.0634 Plans Approval LTR 2024020808-FEB-2024
Letter23.0803 Plans Approval LTR 2024011616-JAN-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

04-OCT-2023Pretreatment Compliance (oversight)In Compliance
03-FEB-2023Compliance Sampling (CSI)In Compliance
07-OCT-2022Pretreatment TAV and File ReviewIn Compliance
20-OCT-2021Pretreatment Compliance (oversight)In Compliance
24-MAR-2021Compliance Eval (non-sampling) (CEI)Out of Compliance
13-JAN-2021Pretreatment AuditIn Compliance
03-DEC-2019Pretreatment TAV and File ReviewIn Compliance
19-DEC-2018Pretreatment Compliance (oversight)In Compliance
17-OCT-2018Compliance Eval (non-sampling) (CEI)Immediately Corrected During Inspection
15-MAR-2018Pretreatment TAV and File ReviewIn Compliance

Wastewater Engineering Plans Review

24.0466ApprovedCDRGO6/13/20246/26/2024Blair Ridge Offsite Sewer
24.0404ApprovedCDRGO5/21/20245/23/2024Redbird Farm Lane Sewer
24.0390ApprovedCDRGO5/17/20245/20/2024Correa Subdivision
24.0379ApprovedCDRGO5/16/20245/21/2024The Courtyards at Stewarts Creek, Phase 2
24.0319ApprovedCDTNH4/26/20245/24/2024Basin A Sewer Rehabilitation Phase 1
24.0272IncompleteCDMJB4/10/2024-Briley Downs Sewer
24.0135ApprovedCDRGO2/21/20244/14/2024Patterson Property Subdivision Sewer
24.0011ApprovedCDRGO1/4/20241/10/2024Sam Davis Property Sewer
23.0813ApprovedCDRGO12/29/20231/10/2024Veterans Landing Sewer
23.0803ApprovedCDRGO12/20/20231/16/2024Stonetrace Lot 5