Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
Home
DWR Permits
Permit Information
Parent Site
Site ID
Site
Location
City
County
EFO Name
4725
ABB Installation Products, Inc.
200 CHALLENGER DR
PORTLAND
Sumner
Nashville
Permit Information
Permit Number
NR2204.174
Permit Type
ARAP
ARAP Type
Bank Armoring and Vegetative Stabilization
Status
Active
Permittee Name
ABB Installation Products, Inc.
Project Name
Portland EPSC Project
Activity Description
Bank armoring and vegetative stabilization associated in Portland, Sumner County, Tennessee. The Project includes installing various erosion prevention and sediment control (EPSC) best management practices (BMPs) at multiple locations with excessive erosion at ABB’s existing manufacturing facility, including 74 linear feet (LF)of intermittent stream.
Permit Rating
Facility Classification
Application Received
13-JUN-2022
Application Returned
13-JUN-2022
Application Complete
13-JUL-2022
Public Notice Date
Issuance Date
Effective Date
13-JUL-2022
Expiration Date
07-APR-2025
Modification Date
Termination Date
Receiving Stream
Summers Branch
Effluent Description
Treatment Description
Design Flow Rate [MGD]
Record Last Updated
01-JUN-2023 01:51PM
Other DWR permits at this site
Go
Actions
1 - 4 of 4
Permit No
Permittee Name
Project Name
Permit Type
Status
Rating
EFO Name
__Issuance__
_Effective_
__Expiration__
TNR058260
ABB Installation Products Inc.
-
TMSP
Active
N/A
Nashville
19-JUL-2020
20-JUL-2020
30-JUN-2025
TNR246358
ABB Installation Products, Inc.
ABB Installation Products, Inc.
CGP
Inactive
N/A
Nashville
-
27-DEC-2022
30-SEP-2026
TEMP852
Thomas & Betts Corp
-
TMSP
No Exposure
N/A
Nashville
-
-
-
TNR145560
Thomas and Betts, Inc.
-
CGP
Inactive
N/A
Nashville
-
25-JUN-2007
-
1 - 4 of 4
Permit Documents
Search All Documents
FileNet Documents
View
File Type
Description
Document Date
Letter
Annual Maintenance Fee Notice Letter
23-MAY-2024
Notice of Coverage (NOC)
NOC - NR2204.174 - Bank Stabilization (08-04-22)
04-AUG-2022
Email
SOS # required
13-JUN-2022
Application
ARAP
13-JUN-2022
Image
Fee Paid
10-JUN-2022
row(s) 1 - 5 of 5
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.
Inspections
no data found
Column Actions
Search
---
Go to Home Page