Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5059Portland STP124 Morningside DrivePortlandSumnerNashville

Permit Information

TN0021865
Individual
Reissuance
City of Portland
Portland STP
Treatment of municipal sewage via two sequencing batch reactors (1.9 MGD) and three sequencing batch reactors in Fall 2024 (2.85 MGD) with chlorine disinfecting and dechlorination. The permittee will meet more stringent effluent limits to maintain formerly permitted loads with expanded treatment capacity. Residual biosolids are digested and land applied on approximately 400 acres.
M
M
MW
09-JUL-2024
03-JUL-2024
09-JUL-2024
16-JUL-2024
19-AUG-2024
01-SEP-2024
31-AUG-2029
Summers Branch at mile 8.6 to the Red River
treated municipal wastewater from Outfall 001
Sequencing Batch Reactor (SBR) activated sludge with chlorination, dechlorination, and post aeration. Sludge: was, imhoff, to land appl.
4952
2.85
23-DEC-2024 09:40AM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR246722City of Portland, Tennessee2020 Wastewater Treatment Plant ExpansionCGPActiveN/ANashville-10-JUL-202330-SEP-2026
TNB021865Portland STP-BiosolidsIncompleteN/ANashville---
  • 1 - 2 of 2

Permit Documents

View
Email2024 NOV Response Corrections- Incorrect methods and DOCs due Jan 18, 2025.17-DEC-2024
LetterPT PC/LL Non-Substantial Modification Final Approval06-DEC-2024
LetterPortland revised PC/LL05-DEC-2024
EmailPT IWS Narrative Condition Satisfied02-DEC-2024
ReportPT IWS26-NOV-2024
Letter2024 NOV Response- DOCs, SOPs, MDLs, bench sheet corrections. Out of date methods still referenced and must be corrected and returned by Jan 18, 2025.19-NOV-2024
Monitoring Report2024 NOV Requirement- Corrected Jan 2023 MOR18-NOV-2024
Monitoring Report2024 NOV Requirement- Corrected 2024 MORs18-NOV-2024
Monitoring Report2024 NOV Requirement- Corrected 2022 MORs18-NOV-2024
Letter2024 PCI Response- will incorporate flow limits in IU permits by Jan 2025 and will submit LL04-NOV-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/I:Permit ViolationsCommissioner's OrderMoratorium on Connections see Item 8 under Order & Assessment Section (page 15).4/18/2017Active58

Inspections

30-OCT-2024Pretreatment Compliance (oversight)Out of Compliance
16-AUG-2024Compliance AssistanceOut of Compliance
17-JUN-2024Compliance Eval (non-sampling) (CEI)Out of Compliance
14-JUN-2023Pretreatment TAV and File ReviewIn Compliance
18-AUG-2022Compliance Eval (non-sampling) (CEI)Out of Compliance
07-JUL-2022Sanitary Sewer SystemIn Compliance
02-JUN-2022Pretreatment Compliance (oversight)In Compliance
25-MAY-2021Pretreatment AuditOut of Compliance
03-MAR-2021Follow-upOut of Compliance
07-JUL-2020Compliance Eval (non-sampling) (CEI)Out of Compliance

Wastewater Engineering Plans Review

24.0325PendingCDRGO4/30/20245/20/2024Bracken Estates - Sanitary Sewer Plans
24.0289PendingCDMJB4/18/20245/23/2024Parkside Pointe SPS & Force main
24.0227PendingCDMJB4/1/20245/30/2024Parkside Pointe
24.0160PendingCDMJT3/1/20244/1/2024Sanitary Sewer Rehab of Portland Sudden Service
23.0747ApprovedCDTNH3/1/20243/26/2024HWY 52E No. 1 Lift Station Relocation
24.0148ApprovedCDJKM2/27/20245/3/2024Harbin Sandye Avenue - Sanitary Sewer Collection Plans
23.0560ApprovedCDJKM2/26/20242/28/2024Richland Estates Subdivision – Sanitary Sewer Collection Plans
24.0015PendingCDTNH1/4/20242/5/2024N Harris Ln Sewer Extension
23.0629PendingCDTNH10/30/20231/29/2024Twin Lakes
23.0350PendingCDTNH7/5/20237/28/2023Collins Sewer Extension