Permit Information

TN0022586
Individual
Reissuance
City of Murfreesboro
Sinking Creek STP
Discharge of treated municipal wastewater and distribution of treated municipal wastewater for non-potable reuse.
M
M
MW, RU, SI
25-MAR-2021
18-MAR-2021
29-MAR-2021
24-MAY-2022
27-JUN-2022
01-JUL-2022
30-JUN-2027
01-SEP-2022
West Fork of the Stones River at mile 10.5
Treated municipal wastewater from Outfall 001 via extended aeration with biological nutrient removal.
Oxidation ditch process with nitrification and denitrification preceded by screening and grit removal and followed by tertiary filtration, ultraviolet disinfection and post aeration. Sludge is dewatered inside rotary sludge presses for landfill disposal.
4952
20
08-NOV-2024 03:30PM

Other DWR permits at this site

  • 1 - 9 of 9
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR1498063D EnterprisesSinking Creek WWTP Phase 4D Contractor Staging AreaCGPInactiveN/ANashville-08-APR-2015-
SOP-10010City of MufreesboroJordan Farm UIC AuthorizationSOPInactiveN/ANashville---
TNR149091City of MurfreesboroPhase 4D ExpansionCGPInactiveN/ANashville-07-APR-2014-
TNB022586Murfreesboro Sinking Creek STP-BiosolidsInactiveN/ANashville---
TNR145816Murfreesboro Water & Sewer Department - Plant Expansion - 4A-CGPInactiveN/ANashville-11-SEP-2007-
NR1204.094Murfreesboro Water & Sewer DepartmentSouthwest Regional Pumping StationARAPInactiveN/ANashville29-JUN-201229-JUN-201230-JUN-2015
NR1204.095Murfreesboro Water & Sewer DepartmentSouthwest Force MainARAPInactiveN/ANashville29-JUN-201229-JUN-201231-DEC-2014
TNR148462Murfreesboro Water and Sewer DepartmentSinking Creek WWTP Plant - Phase 4CCGPInactiveN/ANashville-21-FEB-2013-
TNRX50126Sinking Creek WWTP-TMSPNo ExposureN/ANashville---
  • 1 - 9 of 9

Permit Documents

View
Letter2024 CEI Letter- In compliance, Ongoing improvements in laboratory documentation practices should be prioritized as well as release and overflow event reporting. 06-DEC-2024
EmailPermit number is missing from a number of correspondences and/or Monthly/Quarterly Operation Reports21-AUG-2024
LetterWPN24.0592 Approval Letter 2024081919-AUG-2024
LetterWPN24.0228 Approval Letter 2024043030-APR-2024
LetterWPN24.0142 Approval Letter 2024032222-MAR-2024
Letter23.0601 Approval letter 28-NOV-2023
FormNon-potable Reuse MOR202323-OCT-2023
LetterTN0022586 Murfreesboro Non-Potable Reuse Letter 10.23.202323-OCT-2023
LetterInstantaneous Effluent D.O. result for Saturday did not meet the permit limit19-SEP-2023
LetterInstantaneous Effluent D.O. result for Saturday did not meet the permit limit28-AUG-2023
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

08-NOV-2024Compliance Eval (non-sampling) (CEI)In Compliance
27-APR-2023Pretreatment Compliance (oversight)In Compliance
08-FEB-2023Performance Audit (PAI)Out of Compliance
27-APR-2022Pretreatment AuditOut of Compliance
15-JUN-2021Compliance Eval (non-sampling) (CEI)In Compliance
30-DEC-2020Pretreatment Compliance (oversight)In Compliance
02-DEC-2020Sanitary Sewer Overflow Non-SamplingIn Compliance
24-JUL-2019Compliance Eval (non-sampling) (CEI)In Compliance
23-JUL-2019Pretreatment TAV and File ReviewIn Compliance
09-AUG-2018Pretreatment Compliance (oversight)In Compliance

Wastewater Engineering Plans Review

24.0592Approved-TNH8/1/20248/19/2024Decentralized Wastewater Treatment and STEP Collection Specifications
24.0228ApprovedCDTNH4/1/20244/30/2024MWRRF Phase 4F - Wet Weather Upgrades
24.0142ApprovedCDTNH2/23/20243/22/2024Full-Scale Thermal Dryer
23.0601ApprovedCDA. Bahour11/27/202311/28/2023Bank of America sewerline replacement
23.0342ApprovedPP-ERTNH6/29/20237/27/2023City of Murfreesboro Water Resources Recovery Facility (MWRRF) - Phase 4F Wet Weather Improvements
23.0033ApprovedCDA. Bahour6/12/20236/20/2023Murfreesboro Standard Specifications- Sewer
23.0216ApprovedERCourtlandV4/24/20235/12/2023WATER RESOURCE RECOVERY FACILITY FULL-SCALE THERMAL DRYER
22.0583ApprovedCDA. Bahour4/12/20234/12/2023Salem Barfield Sewer
23.0086ApprovedCDCourtlandV2/16/20233/14/2023River Rock Blvd - Beasie Road Connector Sewer Plans
22.0714ApprovedCDTNH11/16/202212/12/2022N. Highland Sewer forcemain