12792City of Piperton Wastewater Treatment PlantNorth of Highway 57, east of Mt. Zion Rd., adjacent to Norfolk Southern railroad tracksPipertonFayetteMemphisView Map

Permit Information

TN0080764
Individual
Reissuance
City of Piperton
Piperton Municipal Sewer System
Operation of a satellite sewage collection system to Rossville POTW (TN0064092) and future treatment of municipal wastewater via sequencing batch reactor with post-treatment, flow-equalization and peracetic acid disinfecting.
M
M
MW
24-JAN-2023
23-JAN-2023
24-JAN-2023
18-APR-2023
25-MAY-2023
01-JUL-2023
30-JUN-2028
Wolf River at mile 39 (future activity)
treated municipal wastewater from outfall 001 (future activity)
screening, sequencing batch reactor with post equalization, sand filtration, UV disinfecting and post aeration
4952
3
24-SEP-2024 01:25PM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TN0078689City of Piperton Treatment Plant-IndividualInactiveMinorMemphis---
TNR152997WCA Land/William AdairCity of Piperton Treatment PlantCGPInactiveN/AMemphis-19-FEB-2009-
  • 1 - 2 of 2

Permit Documents

View
Letter16-0584 Approval w/ comment19-AUG-2021
Engineering Calculations16-0584 Incoming Correspondence and Calcs - PS and FM to Rossville26-JUL-2016
Environmental Review17.0691 FastTrack Memo and DWR Email Response12-OCT-2017
Memo17.0836 Cover Memo for Remittance of Fee Balance Due09-JAN-2018
Engineering Specifications17.0836 Project Specifications - Excerpted Sheets with Approval Stamp11-JAN-2018
Email17.0836 Response to Plans Review Comments and related email correspondence05-JAN-2018
Engineering Specifications17.0836 Updated Pump Station Calculations12-JAN-2018
Letter17.0836 approval letter; These sewer improvements will serve Pyramex.16-JAN-2018
Engineering Calculations17.0836 cover memo, cover letter and engineering calculations12-DEC-2017
Letter18-0183 Letter19-APR-2018
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

15-APR-2024Compliance Eval (non-sampling) (CEI)In Compliance
21-JUL-2022Compliance Eval (non-sampling) (CEI)In Compliance
07-NOV-2019Sanitary Sewer SystemIn Compliance
01-NOV-2019Compliance Eval (non-sampling) (CEI)In Compliance
04-OCT-2011Reconnaissance (RI)Not Complete and/or Stable

Wastewater Engineering Plans Review

24.0506Review CompletePERTNH6/11/20249/17/2024 Piperton Farms Subdivision - Sanitary Sewer Extension
24.0456PendingCDTNH6/11/20249/17/2024Piperton Farms Subdivision - Sanitary Sewer Extension
24.0294PendingCDMJT4/19/202411/22/2024Provenance Subdivision Lift Station
23.0546PendingCDTNH9/19/202310/19/2023Piper Subdivision
23.0156PendingCDTNH3/20/20235/25/202312-Inch Sanitary Sewer Extension / 18-Inch Jack & Bore; City of Piperton
22.0615Inactive-TNH9/22/2022-City of Piperton Standard Specifications
22.0245InactiveCDA. Bahour6/6/2022-Piperton Preserve Phase 6
21.0493ApprovedCDA. Bahour8/30/20218/30/2021Piperton Hills Subdivision, Phase 1
20.0690ApprovedCDMJB1/6/20211/7/2021Willard Way Sanitary Sewer Improvements
20.0543ApprovedCDZachSeiden10/22/202010/23/2020Decommissioning of Ridgewood Grove and Lakes of Greenbrier