Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
6477City of Bolivar STPNuckolls RoadBolivarHardemanMemphis

Permit Information

TN0077917
Individual
Reissuance
City of Bolivar
Bolivar STP
Treatment of municipal wastewater in a lagoon with complete mix aeration cells and polishing ponds with chlorination. Modify phosphorus concentration limit to report only and limit loading as an annual rolling average.
M
M
MW
24-APR-2024
11-APR-2024
29-APR-2024
20-AUG-2024
26-SEP-2024
01-NOV-2024
30-SEP-2029
Hatchie River at mile 131.0
treated municipal wastewater from Outfall 001
Lagoon with complete mix aeration cells and polishing ponds with chlorination. Lagoon built on site of TN0025275 to replace both TN0025275 and TN0062189.
4952
1.4
26-SEP-2024 09:45AM

Other DWR permits at this site

No other permits found.

Permit Documents

View
PermitFinal NPDES Permit 202426-SEP-2024
Draft PermitDraft NPDES Permit 202420-AUG-2024
MemoWPN24.0416 ARP Memo 2024061818-JUN-2024
ApplicationRCVD VIA DOWNLOAD 24-APR-24: contacts, Form 1, Form 2A, map, MORs, and lab results by Julian McTizic24-APR-2024
EmailIncomplete Application Email11-APR-2024
ApplicationRCVD VIA DOWNLOAD 25-MAR-24: NPDES app by Jim Nuckolls25-MAR-2024
ReportCBI 202229-NOV-2022
Letter22.0084 Approval TDEC letter16-MAR-2022
EmailMyTDEC Forms Req Notification - Event Form02-JUL-2021
Letterdelegation of authority08-APR-2021
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/IEFO Communication 4/12/2019Watch List44

Inspections

20-JAN-2010Reconnaissance (RI)Follow-up Inspection Required
21-JAN-2010Reconnaissance (RI)Minor Deficiency Noted
26-FEB-2010Compliance Biomonitoring (CBI)In Compliance
25-MAY-2010Reconnaissance (RI)Minor Deficiency Noted
28-JUL-2010Reconnaissance (RI)Minor Deficiency Noted
20-OCT-2010Reconnaissance (RI)In Compliance
23-JUN-2011Pretreatment TAV and File ReviewIn Compliance
12-JAN-2012Compliance Eval (non-sampling) (CEI)Minor Deficiency Noted
27-JUL-2012Reconnaissance (RI)Minor Deficiency Noted
07-AUG-2012Reconnaissance (RI)Minor Deficiency Noted

Wastewater Engineering Plans Review

12.0477Review CompletePERJMS7/26/20128/16/2012CDBG-2012 - Bolivar Sewer System Improvements-Phase II
14.0785ApprovedREHABA. Bahour10/16/201412/10/2014Collection System Improvements
14.0801ApprovedREHABMNU10/27/20141/5/2015Rehabilitation of the Jackson Hills and Lynndale Stations
16.0561ApprovedFMMNU7/19/20167/25/2016Holding Tank Pumping Facility & Force Main
17.0843ApprovedIMPA. Bahour1/19/20181/22/20182017 CDBG - City of Bolivar
19.0651ApprovedCDMNU10/8/201910/21/2019Newstead Drive Sewer Line Relocation
20.0009ApprovedCDA. Bahour2/4/20202/7/2020City of Bolivar CDBG Wastewater Collection System Improvements
22.0084ApprovedCDA. Bahour2/22/20223/14/20222021 CDBG Sewer System Lift Station Replacements
24.0416Review CompletePERTNH5/27/20246/18/2024City of Bolivar ARP Preliminary Engineering Report