5139Chattanooga - Moccasin Bend WWTP & Combined Sewer System455 Moccasin Bend RoadChattanoogaHamiltonChattanooga

Permit Information

TN0024210
Individual
Pending
When initially received, all applications are identified as "Pending." Pending status indicates that the application is in the que to be processed or that TDEC-DWR staff are reviewing the application (or Notice of Intent for general permits). Status "Pending" could be also interpreted as "work in progress."
City of Chattanooga
Moccasin Bend WWTP & Combined Sewer System
Municipal treatment of wastewater plus treament of combined sewer flows via off-line storage in containment structures and delayed release of combined sewage to the Moccasin Bend WWTP
M
M
MW
26-JUN-2024
07-OCT-2019
18-JAN-2022
21-MAR-2022
01-APR-2022
31-OCT-2024
Tennessee River (Nickajack Reservoir) miles 457.8 (001-WWTP), 465.2 (004-Citico), 463.3 (005-Tremont, 462.7 (007-M.L. King Blvd.), 464 (006-Ross's Landing), 462.5 (008-19th St.), 461.6 (009-Carter St.), and Chattanooga Creek miles 2.0 (002-Central Ave.) and 1.4 (003-Williams St.).
Biologically treated municipal wastewater from Outfall 001 (WWTP); Primary treated combined sewer wastewater from Outfalls 002 through 009 for designed releases with partial treatment of combined sewer wastewater for only a limited number of discharge events.
Municipal Wastewater: High purity oxygen activated sludge treatment with chlorine disinfection; Combined wastewater: Screening or floatable removal, grit removal and primary clarification for designed releases; Other releases are limited.
4952
140
26-JUN-2024 11:03AM

Other DWR permits at this site

  • 1 - 7 of 7
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNB024210Chattanooga Moccasin Bend STPBiosolids ProgramBiosolidsActiveN/AChattanooga27-SEP-201927-SEP-201915-AUG-2024
TNR113631City of ChattanoogaMBWWTP-Warehouse Improvements & Vul.Recommend.CGPActiveN/AChattanooga-03-SEP-202130-SEP-2026
TNR053775City of ChattanoogaMoccasin Bend Wastewater Treatment PlantTMSPActiveN/AChattanooga19-JUL-202020-JUL-202030-JUN-2025
NRS99.204City of ChattanoogaCity of Chattanooga - Moccasin Bend Waste Water Treatment Plant - 200 ft of Culvert at the Unnamed Trib to Tennessee RiverARAPInactiveMajorChattanooga--26-OCT-2001
NR2101.082City of Chattanooga-Moccasin Bend WWTPWarehouse ImprovementsARAPActiveN/AChattanooga-23-AUG-202107-APR-2025
TNR112921Moccasin Bend Wastewater Treatment PlantMoccasin Bend WWTP Secondary Clarifier UpgradesCGPInactiveN/AChattanooga-23-JAN-2017-
TNR112533Moccasin Bend Wastewater Treatment Plant-CGPInactiveN/AChattanooga-03-MAR-2015-
  • 1 - 7 of 7

Permit Documents

View
ApplicationRCVD VIA EMAIL 26-JUN-24: cover letter, Form 2A, map, process schematic, scheduled improvements, outfall maps, outfall schematics, and CSO efficacy report by 26-JUN-2024
LetterWPN 24.0204 Approval letter 2024060404-JUN-2024
Letter24.0280 Approval letter 2024052121-MAY-2024
ReportSSO report 5/9/2409-MAY-2024
EmailApplication Due Date Extension through June 30, 202424-APR-2024
LetterRe: sanitary sewer reroute18-APR-2024
Letter23.0278ADD Approval letter 2024040909-APR-2024
ReportSSO report 4/2/2403-APR-2024
ReportSSO report 3/26/2427-MAR-2024
ReportSSO report 3/26/2426-MAR-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/I:Overflows:WWTP OverloadConsent Order, Director's Order and Federal Consent Decree are all closed. The facility is currently not under any type of moratorium.9/27/2018Closed43

Inspections

10-JAN-2024Pretreatment Compliance (oversight)In Compliance
01-DEC-2022Pretreatment TAV and File ReviewIn Compliance
31-AUG-2022Sanitary Sewer Overflow Non-SamplingIn Compliance
06-APR-2022Pretreatment Compliance (oversight)In Compliance
15-JUL-2021Performance Audit (PAI)In Compliance
22-JAN-2021Pretreatment Follow-upIn Compliance
22-JAN-2021Pretreatment AuditIn Compliance
12-AUG-2020CSO Inspection Non-SamplingIn Compliance
30-NOV-2019Pretreatment TAV and File ReviewIn Compliance
28-JAN-2019Pretreatment Compliance (oversight)In Compliance

Wastewater Engineering Plans Review

24.0433IncompleteCDMJB5/31/2024-Seneca Avenue Sewer Extension
24.0280ApprovedCDMJB4/15/20245/21/2024E2i2 SSO Abatement Program - South Lee Hwy Conveyance Improvements
24.0279IncompleteCDMJB5/13/2024-E2i2 SSO Abatement Program - North Lee Hwy Conveyance Improvements
24.0204ApprovedCDMJB5/31/20246/4/2024Old Lee Force Main Extension
23.0497ApprovedCDMJB10/18/202310/18/2023Pump Station Improvements - Phase 2 (Contract No. W-20-021-201), Part 1 - Big Ridge #5 Pump Station Improvements (Project No. W-20-021)
23.0371ApprovedCDMJB9/25/20239/26/202323rd Street Pump Station Bypass Vault and Gate Replacement
23.0278RApprovedCDMJB10/30/202311/28/2023Highland Park Pump Station Improvements
23.0278ADDApprovedCDMJB2/26/20244/9/2024Highland Park Pump Station Improvements
23.0278ApprovedCDMJB6/1/20236/8/2023Highland Park Pump Station Improvements
22.0645ApprovedCDTNH11/28/202211/29/2022North River Commerce Center