Site IDSiteLocationCityCountyEFO Name
5255City of Lebanon Gasification Plant dba Lebanon Waste Water Treatment Plant321 Hartmann DriveLebanonWilsonNashville

Permit Information

TN0028754
Individual
Reissuance
City of Lebanon
Lebanon POTW
Treatment of municipal sewage by conventional activated sludge preceded by flow equalization, mechanical screening and grit removal and followed by ultraviolet disinfection.
M
M
MW, RU
19-DEC-2023
16-JAN-2024
16-APR-2024
24-JUN-2024
01-AUG-2024
31-MAY-2029
Cumberland River (Old Hickory Reservoir) at mile 252.2
treated municipal wastewater from Outfall 001
4952
10
08-JUL-2024 03:49PM

Other DWR permits at this site

  • 1 - 3 of 3
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR146287City of Lebanon, Dept. of Public Works-CGPInactiveN/ANashville-22-APR-2008-
NR1804.078City of Lebanon, Dept. of Public WorksBlaire Lane Sewer UpsizeARAPInactiveN/ANashville-10-MAY-201806-APR-2020
TNB028754Lebanon STP-BiosolidsActiveN/ANashville15-APR-202015-APR-202015-AUG-2024
  • 1 - 3 of 3

Permit Documents

View
ApplicationRCVD VIA EMAIL 19-DEC-23: NPDES app by Regina Santana (signature verified by Jeremiah Exum)19-DEC-2023
ApplicationRCVD VIA EMAIL 19-DEC-18: NPDES app by Jeff Baines.19-DEC-2018
Draft PermitDraft permit 202418-APR-2024
Draft PermitDraft permit 201918-MAR-2019
EmailPAI Response09-APR-2024
Emailseptic receiving station is online 28-DEC-2023
EmailAeration Basin Project Update02-NOV-2023
EmailProgress on the septage receiving station and aeration projects06-OCT-2023
EmailPlant Upset Lab Values19-SEP-2023
EmailPlant Upset Outfall Photos13-SEP-2023
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/ILetterSelf Imposed Moratorium, Spoke with Regina Santana at the city. The facility has been allowed to add to collection system at a rate based on the reduction in flow as a result of rehabilitation work. The main plant was also expanded. - JAH 3/4/2016 The facility submitted in May 2016 the 2015 status report which stated that they did not have five overflows in the same location since 2011. The order was closed officially on 15-SEP-16. The city is not on a moratorium. JAH 9/22/2016 9/22/2016Watch List66

Inspections

30-JUN-2024Compliance AssistanceIn Compliance
09-FEB-2024Performance Audit (PAI)In Compliance
09-FEB-2024Compliance Biomonitoring (CBI)In Compliance
29-MAR-2023Pretreatment Compliance (oversight)In Compliance
07-MAR-2022Pretreatment AuditOut of Compliance
25-JAN-2022Compliance Eval (non-sampling) (CEI)Out of Compliance
30-JAN-2020Compliance Eval (non-sampling) (CEI)Out of Compliance
07-JAN-2020Pretreatment Compliance (oversight)Out of Compliance
29-MAR-2019Pretreatment TAV and File ReviewIn Compliance
01-DEC-2017Sanitary Sewer Overflow Non-SamplingIn Compliance

Wastewater Engineering Plans Review

24.0457Pending-MJT7/16/2024-Barton Village Phase 3
24.0487PendingCDMJB7/15/2024-HWY 109 Warehouses Public Sanitary Sewer
24.0447Pending-MJT7/11/2024-Summercrest Sewage Pump Station Replacement
24.0445Pending-MJT7/11/2024-North College Street Alley Utility Replacements
24.0527Pending-MJB7/10/2024-Woodbridge Glen Phases 3-4
23.0749RPending-MJT7/9/2024-Hamilton Springs Retail Center: REVISED PLANS
24.0508ApprovedCDRGO7/2/20247/9/2024Project Soaring Eagle Sewer
24.0127ApprovedCDJKM5/13/20246/12/2024MANOR VIEW, SECTION 3 (SEWER)
24.0357ApprovedCDMJT5/9/20247/22/2024Timber Ridge Pump Station Upgrades
24.0216ApprovedCDMJB5/6/20245/7/2024Bartons Mill Subdivision