Site IDSiteLocationCityCountyEFO Name
5723Limestone Water Utility Operating Company, LLC (formerly Chapel Woods Homeowners Association)Highway 99Chapel HillMarshallColumbia

Permit Information

TN0062073
Individual
Reissuance
Limestone Water Utility Operating Company, LLC
Chapel Woods Subdivision STP
Treatment of domestic sewage via septic tank effluent gravity collection and an anaerobic upflow reactor with a nitrification tower. Disinfecting is by ultraviolet radiation and chlorination with dechlorination.
I
M
DW
03-SEP-2024
09-MAY-2013
04-SEP-2024
10-SEP-2024
18-OCT-2024
01-NOV-2024
31-OCT-2029
31-JAN-2023
Duck River at mile 177.5
treated municipal wastewater from Outfall 001
Septic tank effluent gravity collection, an anaerobic up flow reactor with the nitrification tower. Disinfection is by UV radiation and chlorination with dechlorination. Solids are returned to the anaerobic reactor, periodic transfer to POTW for disposal
4952
.05
29-OCT-2024 12:02PM

Other DWR permits at this site

No other permits found.

Permit Documents

View
Engineering Drawings-PlansOutfall Line Route to Duck River and Easement17-AUG-1987
MemoOverview of CRM held September 23, 2014 with officials from the Chapel Woods HOA and DWR. Sign-in sheet is attached.15-APR-2015
LetterCRM Follow-up Letter form HOA President26-APR-2015
FormRCVD 02-JUN-15: form re: ck# 5567 for $500 by Gale Campbell.02-JUN-2015
Letter2015 WW Operator Form21-AUG-2015
LetterProposal submitted by the HOA in lieu of satisfying permit requirement to retain a bond.02-SEP-2015
Notice of Violation2015 CEI NOV Aug21-SEP-2015
Form2015 ICIS Entry Aug22-SEP-2015
LetterLetter from Chapel Woods HOA in response to the September 2015 Notice of Violation.29-OCT-2015
LetterNotification of Certified Operator19-NOV-2015
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

17-MAY-2007Compliance Eval (non-sampling) (CEI)In Compliance
12-AUG-2009Compliance Eval (non-sampling) (CEI)In Compliance
29-SEP-2011Compliance Eval (non-sampling) (CEI)Notice of Deficiency
27-SEP-2013Compliance Eval (non-sampling) (CEI)NOV
22-MAY-2014Compliance Eval (non-sampling) (CEI)CRM Requested
25-AUG-2015Compliance Eval (non-sampling) (CEI)Out of Compliance
21-JUN-2018Compliance Eval (non-sampling) (CEI)In Compliance
17-JUL-2020Compliance Eval (non-sampling) (CEI)In Compliance
21-SEP-2023Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review