Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5059Portland STP124 Morningside DrivePortlandSumnerNashville

Permit Information

TN0021865
Individual
Reissuance
City of Portland
Portland STP
Treatment of municipal sewage via two sequencing batch reactors (1.9 MGD) and three sequencing batch reactors in Fall 2024 (2.85 MGD) with chlorine disinfecting and dechlorination. The permittee will meet more stringent effluent limits to maintain formerly permitted loads with expanded treatment capacity. Residual biosolids are digested and land applied on approximately 400 acres.
M
M
MW
09-JUL-2024
03-JUL-2024
09-JUL-2024
16-JUL-2024
19-AUG-2024
01-SEP-2024
31-AUG-2029
Summers Branch at mile 8.6 to the Red River
treated municipal wastewater from Outfall 001
Sequencing Batch Reactor (SBR) activated sludge with chlorination, dechlorination, and post aeration. Sludge: was, imhoff, to land appl.
4952
2.85
26-AUG-2024 08:00AM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR246722City of Portland, Tennessee2020 Wastewater Treatment Plant ExpansionCGPActiveN/ANashville-10-JUL-202330-SEP-2026
TNB021865Portland STP-BiosolidsIncompleteN/ANashville---
  • 1 - 2 of 2

Permit Documents

View
SpreadsheetPT PTL Spreadsheet15-JUL-2024
SpreadsheetDevelopment Taps - Moratorium Relief Zone 410-JAN-2024
SpreadsheetExcel Spreadsheet with Updated Local Limits03-SEP-2021
SpreadsheetPTL spreadsheet and docs26-NOV-2019
ReportDevelopment Taps - Moratorium Relief Zone 630-JUN-2023
ReportPT Apr 2022 SAR with Revisions10-MAY-2022
Report2021 CMOM Annual Report26-MAR-2022
ReportWWO, PEE 31 813 N Broadway., (Summers Branch #3)29-NOV-2021
ReportDWO, Split in Force Main, 109 Jason Ct (unnamed tributary to W Drakes Fork)04-NOV-2021
ReportPT Oct 2021 SAR29-OCT-2021
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

I/I:Permit ViolationsCommissioner's OrderMoratorium on Connections see Item 8 under Order & Assessment Section (page 15).4/18/2017Active58

Inspections

16-AUG-2024Compliance AssistanceOut of Compliance
17-JUN-2024Compliance Eval (non-sampling) (CEI)Out of Compliance
14-JUN-2023Pretreatment TAV and File ReviewIn Compliance
18-AUG-2022Compliance Eval (non-sampling) (CEI)Out of Compliance
07-JUL-2022Sanitary Sewer SystemIn Compliance
02-JUN-2022Pretreatment Compliance (oversight)In Compliance
25-MAY-2021Pretreatment AuditOut of Compliance
03-MAR-2021Follow-upOut of Compliance
07-JUL-2020Compliance Eval (non-sampling) (CEI)Out of Compliance
01-JUL-2020Sanitary Sewer Overflow Non-SamplingOut of Compliance

Wastewater Engineering Plans Review

24.0289ApprovedCDMJB5/23/20245/23/2024Parkside Pointe SPS & Force main
24.0325ApprovedCDRGO4/30/20245/20/2024Bracken Estates - Sanitary Sewer Plans
24.0227ApprovedCDMJB4/1/20245/30/2024Parkside Pointe
24.0160ApprovedCDMJT3/1/20244/1/2024Sanitary Sewer Rehab of Portland Sudden Service
23.0747ApprovedCDTNH3/1/20243/26/2024HWY 52E No. 1 Lift Station Relocation
24.0148ApprovedCDJKM2/27/20245/3/2024Harbin Sandye Avenue - Sanitary Sewer Collection Plans
23.0560ApprovedCDJKM2/26/20242/28/2024Richland Estates Subdivision – Sanitary Sewer Collection Plans
24.0015ApprovedCDTNH2/2/20242/5/2024N Harris Ln Sewer Extension
23.0629ApprovedCDTNH1/29/20241/29/2024Twin Lakes
23.0350ApprovedCDTNH7/5/20237/28/2023Collins Sewer Extension