Site IDSiteLocationCityCountyEFO Name
4896Cemex Construction Materials Atlantic, LLC FKA Ideal Basic, FKA Dixie Cement6212 Cement Plant RoadKnoxvilleKnoxKnoxville

Permit Information

TN0003352
Individual
Reissuance
CEMEX Construction Materials Atlantic, LLC
Knoxville Cement Plant
manufacturing hydraulic Portland cement; active quarrying is conducted on-site for the extraction of clay and limestone, which are utilized in production of cement
I
P
PW, NPW, DW, SW
07-MAY-2024
21-MAY-2019
29-MAY-2024
17-SEP-2024
29-OCT-2024
01-DEC-2024
31-OCT-2029
Woods Creek to Holston River at mile 5.9 for Outfalls 001, SW1, SW2, and SW4, Holston River at mile 6.2 for Outfall SW3; Holston River at mile 5.8 for Outfall 003 and Holston River at mile 5.7 for Outfall 002
treated sanitary wastewater through Outfall 001, treated quarry pump out water and truckwash wastewater (including directed settling pond overflow to quarry pit IMP02A) through Outfall 002, treated non-contact cooling water and equipment/building washwater/condensate through Outfall 003, and stormwater runoff/intermittent equipment/building low volume washwater/haul road dust control water from Outfalls SW1, SW2, SW3 and SW4; and to operate a Cooling Water Intake Structure.
3241
1422
1429
1459
.174
29-OCT-2024 02:18PM

Other DWR permits at this site

No other permits found.

Permit Documents

View
Form2016 Cert Operator Form05-AUG-2016
Report2022 Surface Mining Annual Report04-JAN-2023
ApplicationAlternative Analysis information for application20-JUN-2019
ReportAnnual Report Letter11-JAN-2022
ApplicationApplication for Reissue_Received of James Scott_03 May 201903-MAY-2019
LetterCEI02-FEB-2016
LetterCEI-2405-MAR-2024
Inspection ReportCEMEX 2018 CEI Report22-MAR-2018
Monitoring ReportCEMEX Jan 22 MOR02-MAR-2022
Monitoring ReportCEMEX Knox MOR April 2121-MAY-2021
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

01-MAR-2024Compliance Eval (non-sampling) (CEI)In Compliance
05-JAN-2024Compliance AssistanceIn Compliance
20-OCT-2022Compliance Eval (non-sampling) (CEI)In Compliance
03-JUN-2020Compliance Eval (non-sampling) (CEI)In Compliance
28-FEB-2018Compliance Eval (non-sampling) (CEI)In Compliance
12-APR-2017Follow-upIn Compliance
27-JAN-2016Compliance Eval (non-sampling) (CEI)In Compliance
11-DEC-2015Compliance Eval (non-sampling) (CEI)In Compliance
22-APR-2014Compliance Eval (non-sampling) (CEI)In Compliance
14-JAN-2014Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

no data found