5045Dyer STP199 Becton DriveDyerGibsonJackson

Permit Information

TN0021563
Individual
Reissuance
City of Dyer
Dyer STP
Treatment of municipal sewage by extended aeration activated sludge (oxidation ditch) and chlorine disinfection
I
M
MW
01-FEB-2022
16-FEB-2022
19-APR-2022
20-MAY-2022
01-AUG-2022
31-JUL-2027
Sand Creek at mile 1.6
treated municipal wastewater from Outfall 001
Extended aeration activated sludge (oxidation ditch), chlorine disinfecting. Sludge is dried on beds.
4952
.675
08-JUL-2024 03:49PM

Other DWR permits at this site

Permit Documents

View
Letter23.0620 Approval letter29-NOV-2023
MemoCertified Operators in Charge 202424-JUL-2024
LetterComplete Application Letter23-MAR-2017
LetterDelegation of Authority 11-AUG-2021
Draft PermitDraft Permit19-APR-2022
Draft PermitDraft Permit14-JUN-2017
Inspection ReportDyer 04-MAR-2015
FormDyer CEI 356024-SEP-2012
LetterDyer CEI inspection letter24-SEP-2012
EmailDyer COIDC 202328-JUL-2023
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetter607 North Main Street and the Becton Street lift station running parallel to Sand Creek has reported 15 overflows to our MyTDEC system since 9/1/2023-- the permit conditions requiring a self-imposed moratorium have been met.2/13/2024Active72
I/I4 overflows between July 2011 and January 2013. Removed from moratorium list by PMS on 4/3/13.4/3/2013Closed72

Inspections

09-MAY-2024Compliance Eval (non-sampling) (CEI)In Compliance
23-JUL-2019Compliance Eval (non-sampling) (CEI)In Compliance
23-AUG-2018Follow-upIn Compliance
13-SEP-2017Compliance Eval (non-sampling) (CEI)In Compliance
29-AUG-2017Compliance Eval (non-sampling) (CEI)In Compliance
26-FEB-2015Compliance Eval (non-sampling) (CEI)In Compliance
22-AUG-2014Reconnaissance (RI)In Compliance
11-JUN-2014Reconnaissance (RI)In Compliance
04-APR-2014Reconnaissance (RI)In Compliance
08-JAN-2014Pretreatment TAV and File ReviewIn Compliance

Wastewater Engineering Plans Review

24.0558PendingCDTNH7/21/20247/31/2024City of Dyer - 2022-8879 - WW-PDC-2 - Wastewater Collection System - Investigation & Lining
24.0415PendingPERTNH5/27/20246/18/20242022-8879 City of Dyer ARP Preliminary Engineering Report
24.0094PendingPERTNH2/7/20242/26/2024City of Dyer I&I Reduction Plan
23.0620PendingCDA. Bahour10/26/202311/29/2023City of Dyer Sewer Line Replacement
14.0165ApprovedIMPA. Bahour3/19/20144/28/20142013 CDBG for Sanitary Sewer Improvements
13.0288Review CompletePERJMS5/29/20137/3/20132013 CDBG - Dyer Sewer System Improvements