Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
4912Smyrna STP100 Jack Hunter DriveSmyrnaRutherfordNashville

Permit Information

TN0020541
Individual
Reissuance
Town of Smyrna
Smyrna STP
Discharge of treated municipal wastewater by aerated activated sludge plant with UV disinfection; Reissuance imposes limits for existing 5.85 MGD facility as well as proposed increase to 9.0 MGD. The applicant will maintain existing loads to minimize degradation with incidental degradation justified by social and economic benefit.
M
M
MW
11-AUG-2021
11-AUG-2021
12-AUG-2021
14-SEP-2021
19-OCT-2021
01-DEC-2021
30-NOV-2026
30-SEP-2009
Stewart Creek at mile 5.65
treated municipal wastewater from Outfall 001 and distribution of treated municipal wastewater for non-potable reuse in irrigation.
Aerated activated sludge plant with UV disinfection. Reuse water system to go on line 6/2011. WAS to thickner to aerob dig to belt press to landfill.
4952
5.85
18-NOV-2024 10:35AM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNB020541Smyrna STP-BiosolidsActiveN/ANashville08-JAN-202008-JAN-202015-AUG-2024
TNR242658Town of Smyrna2018 Wastewater Treatment Plant ExpansionCGPInactiveN/ANashville-25-JUN-201830-SEP-2026
  • 1 - 2 of 2

Permit Documents

View
Letter24.0764 Plans Approval LTR 2024101414-OCT-2024
Letter24.0761 Plans Approval LTR 2024101414-OCT-2024
LetterWPN 22.0665 Extension Letter 10.02.202402-OCT-2024
Letter24.0683 Plans Approval LTR 2024092424-SEP-2024
LetterWPN24.0618 Approval Letter 2024091717-SEP-2024
Letter24.0633 Approval letter 2024091616-SEP-2024
LetterWPN24.0255 Approval Letter 2024090405-SEP-2024
LetterWPN24.0256 Approval Letter 2024090405-SEP-2024
Letter24.0272 Approval letter 2024080202-AUG-2024
Letter24.0582 Plans Approval LTR 2024073131-JUL-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

04-OCT-2023Pretreatment Compliance (oversight)In Compliance
03-FEB-2023Compliance Sampling (CSI)In Compliance
07-OCT-2022Pretreatment TAV and File ReviewIn Compliance
20-OCT-2021Pretreatment Compliance (oversight)In Compliance
24-MAR-2021Compliance Eval (non-sampling) (CEI)Out of Compliance
13-JAN-2021Pretreatment AuditIn Compliance
03-DEC-2019Pretreatment TAV and File ReviewIn Compliance
19-DEC-2018Pretreatment Compliance (oversight)In Compliance
17-OCT-2018Compliance Eval (non-sampling) (CEI)Immediately Corrected During Inspection
15-MAR-2018Pretreatment TAV and File ReviewIn Compliance

Wastewater Engineering Plans Review

24.0764Inactive-RGO10/24/210/14/2024Hidden Hills Sec 6, Ph 2A Sewer
24.0761InactiveCDRGO10/24/110/14/2024Courtyard at Stewarts Creek, Phase 3
24.0683InactiveCDRGO9/24/39/24/2024Hidden Springs Sewer
24.0618ApprovedCDTNH8/10/20249/17/2024Basin A Sewer Rehabilitation Phase 2
24.0633ApprovedCDMJB9/13/20249/16/2024Villagewood Sewer
24.0256ApprovedCDMJT4/5/20249/4/2024NEWBERRY OFFSITE SEWER
24.0255ApprovedCDMJT4/24/59/4/2024NEWBERRY SEWER
24.0582InactiveCDRGO7/24/267/31/2024Sewart's Landing Roadway Sewer
24.0272ApprovedCDMJB4/24/107/31/2024Briley Downs Sewer
24.0491ApprovedCDMJT6/21/20247/26/2024Greystone Sewer, Phase 1B, Section 2