2119Collegedale Collection Systemoffice located at 9751 Sanborn Drive, Collegedale, TN 37315-1880CollegedaleHamiltonChattanooga

Permit Information

SOP-89136
SOP
Reissuance
City of Collegedale
Municipal Collection System
Sewage collection system to the City of Chattanooga sewerage system
N/A
M
CS
12-FEB-2020
14-FEB-2020
23-JUN-2020
03-AUG-2020
01-SEP-2020
31-AUG-2025
N/A
No discharge allowed
Sewage collection system to Chattanooga STP
4952
2.16
16-SEP-2024 03:14PM

Other DWR permits at this site

No other permits found.

Permit Documents

View
Monitoring Report Qrt-4 Report 202110-NOV-2022
Letter15-0162 Approval letter08-SEP-2015
Letter17-0128 Approval letter16-FEB-2017
Environmental Review17-0128 Information14-FEB-2017
Letter17-0128-Sewer Capacity- Collegedale07-FEB-2017
Letter17-0165 Letter15-MAR-2017
Letter17-0165 Ref15-MAR-2017
Letter17-0475 Ref07-AUG-2017
Letter17-0475 letter07-AUG-2017
Letter17.0545 Approval letter08-SEP-2017
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Chronic OverflowsLetterChronic overflows from manhole #526. Moratorium initiated in 2016. In reviewing a plan design, it was discovered that the manhole referenced in the following moratorium is no longer in service, so this moratorium is no longer in effect. Per the design engineer for the project under review, “Regarding manhole 526, that was a manhole located outside of our pump station, which was abandoned and is no longer in service. While overflows may have previously existed, these occurred when WWTA’s Lee Highway Pump Station was connected to ours. Since their connection to our station was eliminated within the last few years, we have experienced no overflows in our system.” From Matthew Tipton to Bob O'Dette 9/13/20235/2/2019Watch List

Inspections

07-NOV-2022Compliance Evaluations (non-NPDES)In Compliance
31-JUL-2017Compliance Evaluations (non-NPDES)In Compliance
01-JAN-2016Compliance Evaluations (non-NPDES)Out of Compliance

Wastewater Engineering Plans Review

24.0544PendingPERTNH7/16/20248/6/2024Collegedale Pump Station Modernization
24.0371PendingCDMJB5/13/20246/28/2024Chastain Trails - East
23.0516RPending-MJB4/16/20246/26/2024City of Collegedale Standard Specifications & Details
23.0809PendingCDMJT12/26/20231/29/2024Southern Mountain Cottages Sewer Extension
23.0633PendingCDMJB10/31/20232/23/2024Enoch Hurd Subdivision
23.0516PendingCDA. Bahour9/13/202310/16/2023City of Collegedale Standard Specifications & Details
23.0502PendingCDMJT9/6/20239/20/2023Southern Village Sewer Extension
21.0492ApprovedCDMJB6/18/20217/20/2021Apison Villas
21.0035ApprovedCDAWJ4/21/20215/6/2021City of Collegedale Forcemain Replacement
21.0232ApprovedCDTNH4/5/20213/19/2021Gabriel Farms Phases 1 and 2