Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
12771Fanning Bend Treatment FacilityAwalt Road - Fanning Bend SubdivisionWinchesterFranklinColumbia

Permit Information

SOP-05030
SOP
Reissuance
Tennessee Wastewater Systems, Inc.
Fanning Bend Treatment Facility for Fanning Bend subdivision at Tims Ford
Septic tanks, effluent collection system, recirculating media filter, UV disinfection and drip irrigation for Fanning Bend subdivision at Tims Ford
N/A
M
DI
03-OCT-2022
04-OCT-2022
11-OCT-2022
13-JAN-2023
01-JUN-2023
31-MAY-2028
N/A
No discharge allowed from this system
Septic tanks, effluent collection system, recirculating media filter, UV disinfection and drip irrigation
.075
26-JAN-2024 11:04AM

Other DWR permits at this site

No other permits found.

Permit Documents

View
Letter24.0717 Approval letter 2024101818-OCT-2024
LetterCompliance Evaluation Inspection30-JUL-2024
ReportOperation and Maintenance Inspection Schedule27-JUN-2024
Inspection ReportDrip Area 2 Inspection January 202429-JAN-2024
Inspection ReportDrip Area 3 Inspection January 202429-JAN-2024
Inspection ReportDrip Area 1 Inspection January 202429-JAN-2024
Letter23.0309 Approval letter 2023063030-JUN-2023
ReportRCVD VIA EMAIL 01-MAY-23: report re: updated inspection frequency from Jenny Nichols01-MAY-2023
PermitFinal Permit13-JAN-2023
Draft PermitDraft Permit05-OCT-2022
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

11-JAN-2006Compliance Evaluations (non-NPDES)In Compliance
10-AUG-2010Compliance Eval (non-sampling) (CEI)In Compliance
14-NOV-2012Compliance Eval (non-sampling) (CEI)In Compliance
04-MAR-2014Compliance Eval (non-sampling) (CEI)In Compliance
16-JUN-2016Compliance Eval (non-sampling) (CEI)In Compliance
24-JUL-2018Compliance Evaluations (non-NPDES)In Compliance
18-AUG-2021Compliance Evaluations (non-NPDES)In Compliance
29-JAN-2024Compliance Evaluations (non-NPDES)Out of Compliance
11-JUL-2024Compliance Evaluations (non-NPDES)In Compliance

Wastewater Engineering Plans Review

24.0717ApprovedCDMJB9/17/202410/18/2024Fanning Bend Phase 2 Revision of Lots 29 and 30
23.0309ApprovedCDMJB6/14/20236/30/2023Fanning Bend Phase 7 (19 lots)
21.0846ApprovedCDMJB11/12/202112/6/2021Fanning Bend Phase 5 (9 lots)
05.0657Approved-MNU6/16/20057/7/2005FANNING BEND RESIDENTIAL DEVELP.