Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
5079Lawrenceburg STP110 Ezell DriveLawrenceburgLawrenceColumbia

Permit Information

TN0022551
Individual
Reissuance
Lawrenceburg Utility Systems
Lawrenceburg STP
Treatment of municipal sewage
M
M
MW
02-JUN-2021
23-JUN-2021
21-DEC-2021
24-JAN-2022
01-FEB-2022
31-DEC-2026
Shoal Creek at mile 55.4
treated municipal wastewater from Outfall 001
Sequencing batch reactor (SBR) designed for continuous discharge with chlorine disinfecting
4952
4.5
06-SEP-2024 07:40AM

Other DWR permits at this site

  • 1 - 1 of 1
  • 1 - 1 of 1

Permit Documents

View
LetterPlanning Limits for 6.0 MGD POTW28-AUG-2001
LetterMoratorium Letter19-MAY-2010
Form2011 PCI Form June15-JUN-2011
Letter2011 PCI June 22-JUN-2011
Letter2011 Moratorium for College Ave Sept 26-SEP-2011
LetterRcvd 27-OCT-11: response to imposition of a self-imposed moratorium by Kimberley Eakes.27-OCT-2011
ReportRCVD 27-OCT-11: POTW semi-annual report by Lisa Porter.27-OCT-2011
LetterSENT VIA EMAIL 24-FEB-12: letter re: NOCA by Wade Murphy.24-FEB-2012
Inspection Report2012 TAV May17-MAY-2012
Form2012 TAV Form May 17-MAY-2012
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

Watch List53
Chronic OverflowsLetterNo connections that would flow into the West Point Road Pump Station5/19/2010Closed53
Chronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Simms Street. 3/26/2020Active
Chronic OverflowsLetterSelf imposed moratorium on connections to the collections system that ultimately flow to Old Waynesboro Highway.3/30/2022Active
Chronic OverflowsLetterSelf imposed moratorium on connections that ultimately flow to Garner Lane.2/25/2020Active
Chronic OverflowsLetterSelf imposed moratorium on connections that flow to West Point Pump Station2/12/2018Active
Chronic OverflowsLetterSelf imposed moratorium on connections that ultimately flow to at Veteran's Park.2/25/2020Active

Inspections

11-SEP-2024Compliance Sampling (CSI)Pending
17-APR-2024Pretreatment Compliance (oversight)In Compliance
11-JUL-2023Pretreatment AuditIn Compliance
13-JUL-2022Compliance Eval (non-sampling) (CEI)In Compliance
02-JUN-2022Pretreatment TAV and File ReviewIn Compliance
08-SEP-2021Performance Audit (PAI)In Compliance
12-MAY-2021Pretreatment Compliance (oversight)In Compliance
08-JUL-2020Compliance Sampling (CSI)In Compliance
13-APR-2020Pretreatment TAV and File ReviewIn Compliance
08-AUG-2019Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

24.0476InactiveCDRGO6/24/187/10/2024Jackson Heights Sewer Extension
99.0830ApprovedSTDSPECMBS8/10/19998/20/1999STD SPECS
13.0306Review CompletePERJMS5/29/20137/3/20132013 CDBG - City of Lawrenceburg Sewer System Rehabilitation
14.0023ApprovedLINEA. Bahour1/13/20144/3/2014Canter Chase Apartments
14.0438ApprovedREHABA. Bahour7/9/20148/6/20142013 Sewer System Rehabilitation
16.0353ApprovedRELOCMNU5/6/20166/2/2016Speedway #7103
16.0852ApprovedPSFMA. Bahour11/3/201611/15/2016Hood Lake Wastewater Pump Station & Force Main
18.0396ApprovedLINEA. Bahour6/11/20186/12/20182017 Lawrenceburg Sewer System Rehabilitation
19.0520ApprovedCDJim McAdoo8/16/20198/29/2019Utilities Extension to Southern Tennessee Higher Education Center
20.0242ApprovedCDA. Bahour4/28/20204/28/2020Best Western Hotel Sewer Extension