5785Sevierville (McCroskey Island) STP2295 McCroskey Island RoadSeviervilleSevierKnoxville

Permit Information

TN0063959
Individual
Reissuance
City of Sevierville
McCroskey Island STP
Treatment of municipal sewage; The permit imposes conditions for the current 4.8 MGD design capacity and for planned 8.4 and 12.8 MGD treatment system upgrades.
M
M
MW
01-NOV-2024
08-NOV-2024
19-NOV-2024
01-APR-2020
01-MAY-2025
30-APR-2030
French Broad River Mile 26.75
treated municipal wastewater from Outfall 001
WAS to aerobic digester to centrifuge to co-compost
4952
4.8
23-DEC-2024 11:10AM

Other DWR permits at this site

  • 1 - 4 of 4
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR136828City of SeviervilleMcCroskey Island WWTP ExpansionCGPActiveN/AKnoxville-27-JUN-202230-SEP-2026
TNRX50164McCroskey Island WWTP-TMSPNo ExposureN/AKnoxville---
TNB063959Sevierville McCrosky Island STP-BiosolidsInactiveN/AKnoxville---
TNR133027Sevierville Water Department-CGPInactiveN/AKnoxville-01-APR-2008-
  • 1 - 4 of 4

Permit Documents

View
LetterResponse to NOV dated 10-DEC-2411-DEC-2024
Notice of ViolationNOV for effluent violations on EPA's QNCR from July to September 202410-DEC-2024
Public Notice DocumentRCVD 04-DEC-24: invoice, affidavit, and tearsheet, from the Mountain Press04-DEC-2024
Draft PermitDraft permit; PN 11/19/2419-NOV-2024
SpreadsheetPT PTL Documents - Corrected 05-NOV-2024
LetterPT PTL Town Ltr - Corrected05-NOV-2024
ApplicationRCVD VIA EMAIL 01-NOV-24: updated app by Keith Malone01-NOV-2024
ApplicationRCVD VIA DOWNLOAD 28-OCT-24: Form 2A, map, and flow diagram, by Keith Malone28-OCT-2024
Letter24.0772 Plans Approval LTR 2024101616-OCT-2024
LetterWPN24.0604 Approval Letter 2024091719-SEP-2024
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

OverflowsDirector's OrderThe Respondent shall make no further connections, line extensions, or allow increased flows to its wastewater collection system above any point in the collection system which has experienced 5 or more overflows in the previous 12-month period, except for those currently under construction, legally committed to, or necessitated by subsurface sewage disposal systems which, because of failure, pose a health hazard. Based upon correspondence from Wade Murphy and Rebecca Rush this provision is not applicable because there have not been more than 5 overflows at any point in the collection system--concurrence from Angela Jones. RGO 8/2/202010/4/2017Watch List61

Inspections

06-DEC-2023Compliance Eval (non-sampling) (CEI)Out of Compliance
06-DEC-2023Pretreatment Compliance (oversight)Out of Compliance
19-APR-2023Pretreatment AuditOut of Compliance
01-OCT-2021Pretreatment TAV and File ReviewIn Compliance
27-APR-2021Compliance Eval (non-sampling) (CEI)In Compliance
26-FEB-2021Pretreatment Compliance (oversight)In Compliance
05-FEB-2020Pretreatment TAV and File ReviewIn Compliance
07-MAR-2019Pretreatment Compliance (oversight)In Compliance
23-JUL-2018Compliance Biomonitoring (CBI)In Compliance
26-OCT-2017Pretreatment AuditOut of Compliance

Wastewater Engineering Plans Review

24.0878PendingCDMJB11/27/2024-Collier Drive Bridge Pump Station and Force Main
24.0604PendingCDMJT8/6/20249/17/2024Appalachian Retreat Sewer Plan Phase 1
24.0583PendingCDMJB7/26/20249/5/2024Cherokee Overlook Ph 3-5
24.0497PendingCDRGO6/26/20247/31/2024Exit 407 Phase 2 SL-A & SL-B
24.0366PendingCDMJT5/9/20247/2/2024Center Street Subdivision
24.0283PendingCDRGO4/15/20244/18/2024Sewer Crossing for P S Allen Property
24.0048PendingCDTNH1/22/20242/5/2024Kodak Apartments Sanitary Sewer Extension
24.0047PendingCDMJT1/22/20247/1/2024Highland View Sewer Extension
23.0715PendingCDMJB11/20/20232/27/2024Cherokee Overlook Phase 2
23.0616PendingCDJKM10/24/20231/17/2024Hickory Hill Townhomes - Phase 2