Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Permits
Permit Information
Parent Site
Site ID
Site
Location
City
County
EFO Name
5143
Hallsdale Powell Utility District STP
4301 West Beaver Creek Drive
Powell
Knox
Knoxville
Permit Information
Permit Number
TN0078905
Permit Type
Individual
Status
Reissuance
Permittee Name
Hallsdale Powell Utility District
Project Name
Hallsdale Powell Utility District STP
Activity Description
Treatment of municipal wastewater and inflow and infiltration via parallel treatment trains and influent equalization and storage
Permit Rating
M
Facility Classification
M
Discharge Code
MW
Application Received
31-JUL-2023
Application Returned
Application Complete
01-AUG-2023
Public Notice Date
22-AUG-2023
Issuance Date
02-OCT-2023
Effective Date
01-NOV-2023
Expiration Date
30-SEP-2028
Modification Date
Termination Date
Receiving Stream
Beaver Creek at mile 23.5
Effluent Description
treated municipal wastewater from outfall 001
Treatment Description
6.0 MGD membrane biological reactor preceded by fine screens operating parallel with a 3.7 MGD oxidation ditch train followed by UV disinfection, and post aeration. Flow in excess of 11.9 MGD routed to storage for delayed treatment.
SIC Code
4952
SIC 2
SIC 3
SIC 4
Design Flow Rate [MGD]
9.7
Record Last Updated
23-DEC-2024 09:30AM
Other DWR permits at this site
Go
Actions
1 - 3 of 3
Permit No
Permittee Name
Project Name
Permit Type
Status
Rating
EFO Name
__Issuance__
_Effective_
__Expiration__
TNB024287
Hallsdale Powell Utility District STP
-
Biosolids
Inactive
N/A
Knoxville
-
-
-
TNR056667
Hallsdale Powell Utility District STP
-
TMSP
Active
N/A
Knoxville
19-JUL-2020
20-JUL-2020
30-JUN-2025
TN0024287
Hallsdale Powell Utility District STP
-
Individual
Inactive
Major
Knoxville
31-MAR-2003
01-MAY-2003
31-MAR-2008
1 - 3 of 3
Column Actions
Search
Permit Documents
Search All Documents
View Permit
FileNet Documents
View
File Type
Description
Document Date
Letter
WPN24.0666 Approval Letter 20241004
04-OCT-2024
Letter
WPN24.0627 Approval Letter 20240830
30-AUG-2024
Monitoring Report
MOR 04 2024
15-MAY-2024
Letter
24.0317 Plans Approval LTR 20240501
01-MAY-2024
Monitoring Report
MOR 03 2024
15-APR-2024
Letter
WPN23.0655 Approval Letter 20240318
18-MAR-2024
Monitoring Report
MOR 02 2024
15-MAR-2024
Letter
RCVD VIA EMAIL 23-FEB-24: letter re: Extension of Completion of Industrial Users Survey from Todd Dykes
23-FEB-2024
Monitoring Report
MOR 01 2024
15-FEB-2024
Letter
24.0049 Plans Approval LTR 20240124
24-JAN-2024
row(s) 1 - 10 of 285
Next
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.
Moratorium
Problem
Mechanism
Result
Action Date
Status
Percent Annual I I
I/I
EFO Communication
HDPUD acknowledged the existence of a Self-Imposed Moratorium (SIM) in a letter from Jacobs Engineering, July 7, 2015 requesting a waiver of the SIM based on approval of the CAP-ER. May 23, 2016, Compliance Enforcement approved the CAP-ER and included language "Implementation of CAP-ER will enable compliance with the self-imposed moratorium language in the NPDES Permit...". The CAP-ER requires HPUD to certify new connections based on hydraulic modeling. In a July 2019 meeting between KEFO and HDPUD, it was agreed that HDPUD would include a certifying statement in all plans submitted that hydraulic modeling had been done and validated the system can handle the added flows. Robert Ramsey email dated 4/16/19
4/17/2019
Active
58
Inspections
Inspection Date
Type
Result
21-AUG-2024
Sanitary Sewer System
Pending
29-MAY-2024
Compliance Sampling (CSI)
Pending
21-SEP-2022
Compliance Eval (non-sampling) (CEI)
In Compliance
18-AUG-2020
Compliance Eval (non-sampling) (CEI)
In Compliance
25-MAR-2019
Compliance Assistance
In Compliance
06-SEP-2018
Compliance Eval (non-sampling) (CEI)
In Compliance
08-JUN-2017
Compliance Eval (non-sampling) (CEI)
In Compliance
03-MAR-2016
Compliance Eval (non-sampling) (CEI)
In Compliance
26-MAR-2014
Compliance Eval (non-sampling) (CEI)
Order Requested
22-AUG-2013
Compliance Eval (non-sampling) (CEI)
In Compliance
row(s) 1 - 10 of 12
Next
Wastewater Engineering Plans Review
Project no
Plans Status
Type
Reviewer
Date Received
Approved Date
Project Name
24.0666
Approved
CD
TNH
10/3/2024
10/4/2024
Bell Town Subdivison on W. Emory Road
24.0749
Approved
CD
MJT
9/26/2024
12/2/2024
O.T. Tindell
24.0627
Approved
CD
TNH
8/14/2024
8/30/2024
Dixon Springs Lane Low Pressure Sewer
24.0317
Approved
CD
RGO
4/25/2024
5/1/2024
Neely Landing
24.0049
Approved
CD
RGO
1/22/2024
1/24/2024
Vincent Landing Sewer Extension
24.0018
Approved
CD
RGO
1/8/2024
1/12/2024
JW Construction on Brown Gap Rd (25507)
23.0655
Approved
CD
MJT
11/9/2023
3/18/2024
Mesana Investments - Beeler Road
23.0471
Approved
CD
MJB
10/17/2023
10/17/2023
Gravity Sewer Extension for The Villas at Rogers Farm
23.0509
Approved
CD
MJT
10/6/2023
10/10/2023
Preserve at Hines Branch (25434-1)
23.0520
Approved
CD
JKM
9/14/2023
10/5/2023
Mayhew property subdivision
row(s) 1 - 10 of 111
Next