Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Permits
Permit Information
Parent Site
Site ID
Site
Location
City
County
EFO Name
5059
Portland STP
124 Morningside Drive
Portland
Sumner
Nashville
Permit Information
Permit Number
TN0021865
Permit Type
Individual
Status
Reissuance
Permittee Name
City of Portland
Project Name
Portland STP
Activity Description
Treatment of municipal sewage via two sequencing batch reactors (1.9 MGD) and three sequencing batch reactors in Fall 2024 (2.85 MGD) with chlorine disinfecting and dechlorination. The permittee will meet more stringent effluent limits to maintain formerly permitted loads with expanded treatment capacity. Residual biosolids are digested and land applied on approximately 400 acres.
Permit Rating
M
Facility Classification
M
Discharge Code
MW
Application Received
09-JUL-2024
Application Returned
03-JUL-2024
Application Complete
09-JUL-2024
Public Notice Date
16-JUL-2024
Issuance Date
19-AUG-2024
Effective Date
01-SEP-2024
Expiration Date
31-AUG-2029
Modification Date
Termination Date
Receiving Stream
Summers Branch at mile 8.6 to the Red River
Effluent Description
treated municipal wastewater from Outfall 001
Treatment Description
Sequencing Batch Reactor (SBR) activated sludge with chlorination, dechlorination, and post aeration. Sludge: was, imhoff, to land appl.
SIC Code
4952
SIC 2
SIC 3
SIC 4
Design Flow Rate [MGD]
2.85
Record Last Updated
29-OCT-2024 12:20PM
Other DWR permits at this site
Go
Actions
1 - 2 of 2
Permit No
Permittee Name
Project Name
Permit Type
Status
Rating
EFO Name
__Issuance__
_Effective_
__Expiration__
TNR246722
City of Portland, Tennessee
2020 Wastewater Treatment Plant Expansion
CGP
Active
N/A
Nashville
-
10-JUL-2023
30-SEP-2026
TNB021865
Portland STP
-
Biosolids
Incomplete
N/A
Nashville
-
-
-
1 - 2 of 2
Column Actions
Search
Permit Documents
Search All Documents
View Permit
FileNet Documents
View
File Type
Description
Document Date
Letter
2024 PCI Response- will incorporate flow limits in IU permits by Jan 2025 and will submit LL
04-NOV-2024
Letter
PT Prelim Approval for IU Status Change
31-OCT-2024
Letter
2024 PCI Letter- Must reissue permits with language corrections, section additions, corrected limit tables, and flow limits.
30-OCT-2024
Inspection Report
2024 PCI Inspection Checklist
30-OCT-2024
Email
PT Narrative Conditions Reminder
29-OCT-2024
Report
PT Supporting Documents for IU Status Change
21-OCT-2024
Email
Request for NOV Extension to November 18- Granted
18-OCT-2024
Letter
Letter to home owners at 123 Gravel Lane from the City if Portland requiring the home owner to repair the private sewer pump of their property. The letter gives them a deadline and explains what will happen if the repairs are not made.
23-SEP-2024
Email
Request from Jennifer Young for extension of July 2024 NOV action items, granted for October 19, 2024
17-SEP-2024
Permit
Minor Modification of total mercury sample type so it matches ICIS reporting.
16-SEP-2024
row(s) 1 - 10 of 599
Next
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.
Moratorium
Problem
Mechanism
Result
Action Date
Status
Percent Annual I I
I/I:Permit Violations
Commissioner's Order
Moratorium on Connections see Item 8 under Order & Assessment Section (page 15).
4/18/2017
Active
58
Inspections
Inspection Date
Type
Result
19-DEC-2006
Biosolids Inspection
Minor Deficiency Noted
01-JUN-2007
Pretreatment Compliance (oversight)
In Compliance
01-JUN-2007
Compliance Eval (non-sampling) (CEI)
NOV
12-JUN-2008
Pretreatment Compliance (oversight)
In Compliance
02-JUN-2009
Performance Audit (PAI)
NOV
10-JUN-2009
Pretreatment TAV and File Review
In Compliance
08-MAR-2010
Compliance Biomonitoring (CBI)
In Compliance
09-DEC-2010
Compliance Sampling (CSI)
In Compliance
14-JUN-2011
Pretreatment Audit
Minor Deficiency Noted
02-MAY-2012
Compliance Eval (non-sampling) (CEI)
Minor Deficiency Noted
row(s) 1 - 10 of 32
Next
Wastewater Engineering Plans Review
Project no
Plans Status
Type
Reviewer
Date Received
Approved Date
Project Name
24.0227
Approved
CD
MJB
4/1/2024
5/30/2024
Parkside Pointe
24.0289
Approved
CD
MJB
5/23/2024
5/23/2024
Parkside Pointe SPS & Force main
24.0325
Approved
CD
RGO
4/30/2024
5/20/2024
Bracken Estates - Sanitary Sewer Plans
24.0148
Approved
CD
JKM
2/27/2024
5/3/2024
Harbin Sandye Avenue - Sanitary Sewer Collection Plans
24.0160
Approved
CD
MJT
3/1/2024
4/1/2024
Sanitary Sewer Rehab of Portland Sudden Service
23.0747
Approved
CD
TNH
3/1/2024
3/26/2024
HWY 52E No. 1 Lift Station Relocation
23.0560
Approved
CD
JKM
2/26/2024
2/28/2024
Richland Estates Subdivision – Sanitary Sewer Collection Plans
24.0015
Approved
CD
TNH
2/2/2024
2/5/2024
N Harris Ln Sewer Extension
23.0629
Approved
CD
TNH
1/29/2024
1/29/2024
Twin Lakes
23.0350
Approved
CD
TNH
7/5/2023
7/28/2023
Collins Sewer Extension
row(s) 1 - 10 of 75
Next