SOP-04058
SOP
Modification
Town of Thompson's Station
Thompson's Station Regional Treatment Facility
Improvements include upgraded influent pumping, new headworks screening, influent equalization using Cell 2, new aeration basins and MBR, UV disinfection, aerobic digestion, and solids dewatering. Modification extends the reuse compliance schedule 1 year.
N/A
M
DI, RU
31-AUG-2021
13-SEP-2021
14-SEP-2021
19-JAN-2022
19-JAN-2022
30-SEP-2025
N/A
No discharge allowed from this system also permitted for unrestricted non-potable reuse
grinder pump, low pressure collection system, aerated treatment/storage lagoons (sheaffer), MBR, aerobic digestion, disc filters, UV disinfection and drip irrigation
.8112
26-JAN-2024 11:04AM

Other DWR permits at this site

  • 1 - 2 of 2
Permit NoPermittee NameProject NamePermit TypeStatusRatingEFO Name__Issuance___Effective___Expiration__
TNR247125Town of Thompson's StationThompson's Station Regional Wastewater Treatment Plant UpgradesCGPActiveN/ANashville-27-DEC-2023-
NR2104.197Town of Thompson's StationThompson's Station Regional Wastewater Treatment Plant - 14 inch sewer main, 6-inch water lineARAPActiveN/ANashville-10-SEP-202107-APR-2025
  • 1 - 2 of 2

Permit Documents

View
Letter24.0600 Plans Approval LTR 2024082020-AUG-2024
LetterNotification of change in certified operator13-JUN-2024
LetterWPN23.0424 Approval Letter 2024030101-MAR-2024
LetterWPN23.0313 Approval Letter 2023100609-OCT-2023
MemoREF 31-MAY-23: Thompson's Station meeting agenda w/ notes by VMJ31-MAY-2023
EmailPipe termination for cell 1, update on MBR progress22-MAY-2023
Inspection Report2022-2023 CEI26-APR-2023
EmailDrip Signage24-APR-2023
Letter21.0541R4 ESU's SRF Memo 2023032020-MAR-2023
ReportOverflow Report - 2904 Butcher's Mill Bridge Court. Up to 2,000 gallons was estimated and entered nearby storm drains.24-JAN-2023
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

28-MAR-2023Compliance Evaluations (non-NPDES)In Compliance
02-MAY-2017Compliance Evaluations (non-NPDES)In Compliance
04-AUG-2010Compliance Evaluations (non-NPDES)NOV

Wastewater Engineering Plans Review

24.0600ApprovedCDRGO8/24/58/20/2024Thompson's Station Regional WWTP Upgrades - Phase 2
23.0424ApprovedCDTNH8/8/20233/1/2024Station Hill - Phase 1
23.0313ApprovedCDTNH6/15/202310/6/2023Whistle Stop Section 2 thru 5
22.0375ApprovedCDMJB6/6/20226/17/2022Tollgate Town Center, Phase 2B
21.0540Approved-RGO7/13/202111/29/2021SRF Thompson's Station WWTP Upgrades
21.0241RApprovedCDTNH9/20/20219/23/2021Whistlestop Townhomes Revised
21.0367ApprovedCDA. Bahour6/29/20217/1/2021Thompson's Station Standard Specification
21.0287ApprovedCDTNH4/5/20214/27/2021Roderick Place Phase 1
21.0241ApprovedCDTNH3/22/20214/9/2021Whistle Stop Townhomes
20.0702ApprovedCDMJB1/5/20211/7/2021Critz Lane Utility Relocation