Skip to Main Content

Parent Site

Site IDSiteLocationCityCountyEFO Name
4896Cemex Construction Materials Atlantic, LLC FKA Ideal Basic, FKA Dixie Cement6212 Cement Plant RoadKnoxvilleKnoxKnoxville

Permit Information

TN0003352
Individual
Reissuance
CEMEX Construction Materials Atlantic, LLC
Knoxville Cement Plant
manufacturing hydraulic Portland cement; active quarrying is conducted on-site for the extraction of clay and limestone, which are utilized in production of cement
I
P
PW, NPW, DW, SW
07-MAY-2024
21-MAY-2019
29-MAY-2024
20-AUG-2019
27-SEP-2019
01-NOV-2019
31-OCT-2024
Woods Creek to Holston River at mile 5.9 for Outfalls 001, SW1, SW2, and SW4, Holston River at mile 6.2 for Outfall SW3; Holston River at mile 5.8 for Outfall 003 and Holston River at mile 5.7 for Outfall 002
treated sanitary wastewater through Outfall 001, quarry pump out water and truckwash wastewater through Outfall 002 (including overflow backwash pond water through Internal Monitoring Point - Outfall 02A), non-contact cooling water and equipment/building washwater/condensate through Outfall 003, and stormwater runoff/intermittent equipment/building low volume washwater/haul road dust control water from Outfalls SW1, SW2, SW3 and SW4; and to operate a Cooling Water Intake Structure.
3241
1422
1429
1459
.174
29-MAY-2024 10:31AM

Other DWR permits at this site

No other permits found.

Permit Documents

View
ApplicationRCVD 07-MAY-24: Contacts, Form 1, Form 2C, Form 2F, maps and reports by Steven Switzer07-MAY-2024
LetterCEI-2405-MAR-2024
Monitoring ReportMOR 12 202322-JAN-2024
Monitoring ReportMOR 11 202315-DEC-2023
PermitSurface Mining Permit06-DEC-2023
Monitoring ReportMOR 10 202313-NOV-2023
ApplicationSurface Mining Application06-NOV-2023
Monitoring ReportMOR 09 202316-OCT-2023
Monitoring ReportMOR 08 202315-SEP-2023
Monitoring ReportMOR 07 202310-AUG-2023
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

01-MAR-2024Compliance Eval (non-sampling) (CEI)In Compliance
05-JAN-2024Compliance AssistanceIn Compliance
20-OCT-2022Compliance Eval (non-sampling) (CEI)In Compliance
03-JUN-2020Compliance Eval (non-sampling) (CEI)In Compliance
28-FEB-2018Compliance Eval (non-sampling) (CEI)In Compliance
12-APR-2017Follow-upIn Compliance
27-JAN-2016Compliance Eval (non-sampling) (CEI)In Compliance
11-DEC-2015Compliance Eval (non-sampling) (CEI)In Compliance
22-APR-2014Compliance Eval (non-sampling) (CEI)In Compliance
14-JAN-2014Compliance Eval (non-sampling) (CEI)In Compliance

Wastewater Engineering Plans Review

no data found