12087Water & Wastewater Authority of Wilson County - Cairo Bend Treatment FacilityCairo Bend RoadLebanonWilsonNashvilleView Map

Permit Information

SOP-04044
SOP
Reissuance
Water and Wastewater Authority of Wilson County
Cairo Bend Treatment Facility
Septic tanks, effluent collection system, recirculating sand filter, UV disinfection to serve Cairo Bend Treatment Facility
N/A
M
DI
17-JAN-2023
20-JAN-2023
24-JAN-2023
26-JUN-2023
01-JUL-2023
31-DEC-2027
N/A
No discharge allowed from this system.
Septic tanks, effluent collection system, recirculating sand filter, UV disinfection
.0195
01-JUL-2024 11:12AM

Other DWR permits at this site

No other permits found.

Permit Documents

View
Engineering Drawings-PlansSoil survey map.12-JUL-2007
Engineering ReportPreliminary engineering report with schematic and maps.08-NOV-2007
Letterreply to 04-JUN-12 NOV27-JUN-2012
ApplicationRCVD VIA EMAIL 21-SEP-12: SOP drip app packet w/ no check by Chris Leauber.21-SEP-2012
LetterNotice of Incomplete application letter01-OCT-2012
Old PermitSOP Permit (2013)01-APR-2013
ReportRCVD VIA EMAIL 13-MAR-15: report re: inspection frequency database from Brian Carter.13-MAR-2015
Form2015 WW Operator Notification Form08-SEP-2015
ApplicationRCVD 13-SEP-17: SOP drip app w/ ck# 9157 for $500 by Chris Leauber.13-SEP-2017
ApplicationCairo Bend Application13-SEP-2017
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Moratorium

no data found

Inspections

03-DEC-2024Follow-upOut of Compliance
11-JUN-2024Compliance Evaluations (non-NPDES)Out of Compliance
10-JAN-2024Compliance Evaluations (non-NPDES)Out of Compliance
21-SEP-2023Compliance Evaluations (non-NPDES)Out of Compliance
28-SEP-2017Compliance Evaluations (non-NPDES)In Compliance
30-MAY-2012Compliance Evaluations (non-NPDES)NOV

Wastewater Engineering Plans Review

24.0843Pending-MJT12/20/2024-Preserve at Belle Pointe Phase 2
08.0110ApprovedSTPMODA. Bahour2/12/20083/18/2008Cairo Bend Phase II